Laserfiche WebLink
Building Setbacks: <br /> <br />1. West (Main Street): <br /> <br />2. North (Owens Drive): <br /> <br />30 Feet - Office <br /> Building <br /> <br />E. Signage: <br /> <br />30 Feet - Office <br /> Building <br /> <br />20 Feet - Parking <br /> Structure <br /> <br />Ail signage shall be developed in accordance with an <br />approved sign program pursuant to Article XI. <br /> <br />F. Landscaping: <br /> <br />Landscape areas shall include all building and parking <br />structure setbacks, a minimum of 3% of open parking ar- <br />eas, screen wall of trees along Santiago Creek and all <br />other areas not utilized for drives, parking or build- <br />ing. <br /> <br />'Section 6. OPERATIONAL STANDARDS <br /> <br />A. PLANNING <br /> <br />That the off-premise advertising sign at the <br />southerly portion of the site be removed prior to the <br />issuance of building permits. <br /> <br />e <br /> <br />That a parcel map be processed and approved for the <br />consolidation of all parcels, including Bachman <br />Drive. <br /> <br />3. Prior to release of use and occupancy permits, all <br /> on-site improvemegts i~cluding landscaping, shall be <br /> in place. <br /> <br />4. Parking shall be provided at a minimum of 3 par~ing <br /> stalls per 1,000 square feet of building gross floor <br /> area. <br /> <br />5. Ail utilities shall be underground. Ail metering <br /> equipment shall be screened from view. <br /> <br />PERMITS AND INSPECTIONS <br /> <br />1. Buildings cannot be built over property lines. <br /> parcel map is required to consolidate lots. <br /> <br />A <br /> <br /> <br />