My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-1856
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1986 (NS-1825 - NS-1882)
>
NS-1856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:03:50 PM
Creation date
6/26/2003 10:08:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-1856
Date
7/7/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New lighting a~d glare resulting from the creation of the <br />proposed project shall be oriented so to ¢:ontain said <br />lighting on-site. New lighting shall not encroach outside <br />the boundaries of the project. <br /> <br />To mitigate short term native impacts on the surrounding <br />community during the construction phase of the proposed <br />project, the following measures shall be required: <br /> <br />a. Construction hours shall not exceed 7AM to 5PM Monday <br /> through Saturday. <br /> <br />be <br /> <br />Loose soil or uncovered ground shall be wetted down at <br />necessary intervals during the construction period to <br />reduce dust levels caused by constr~,ction activity. <br /> <br />The proposed project shall be scree' ~d by a UBC required <br />construction fencing to the approva2 of the Manager of <br />Permits & Inspections. <br /> <br />The developer shall coordinate with he Police and Fire <br />Departments for scheduling of possib.e partial lane <br />closures during land fill operations Measures as pre- <br />scribed by the respective department shall be imposed <br />to reduce the interference of throug traffic on First <br />Street and Fifth Street. <br /> <br />Se <br /> <br />Safety lighting shall be required and approval by the <br />Police and Fire Departments, to be installed throughout <br />the project during the construction period. <br /> <br />fe <br /> <br />Hydrants or other such hydro-safety equipment shall be <br />available on-site at all times and be maintained in good <br />repair. Said equipment shall be approved by the Fire <br />Department and shall be available for recurrent inspec- <br />tions by same. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.