Laserfiche WebLink
B. PHASING <br /> <br />The following are proposed phases of development which coincide with MacArthur Place <br />Off-Site Street Improvement Plan (Attachment "A"), and are I~9~ mandatory. Development is <br />authorized for each phase so long as the required corresponding infrastructure improvements <br />have been completed in accordance with the above provisions. <br /> <br />PHASE TOTAL <br /> <br />! 1,214,925 +400 dwelling units <br />2 455,075 <br />3 835,000 <br />4 835,000 <br />5 835.000 <br />TOTAL 4,175,0001 2 <br /> <br />2 <br /> <br />The 4,175,000 represents a factored number and not square feet. It exceeds <br />maximum permitted square feet of 4,051,000 square feet of Floor Area because residen- <br />tial traffic generation potential has been factored at the rate of 1,000 square feet of <br />office/commercial area for each 3.23 dwelling units. <br /> <br />Parking structures are not included. <br /> <br /> <br />