Laserfiche WebLink
, 25o. '/ <br /> <br />the Property shall comply with such non-conflicting laws and <br />regulations as may from time to time be enacted or <br />amended. Specifically, but without limitation, such non- <br />conflicting laws and regulations shall include the follow- <br />ing: <br /> <br /> (1) Except as otherwise provided herein, taxes, <br />assessments, fees and charges; <br /> <br /> (2) Building, electrical, mechanical, fire and <br />similar codes based upon uniform codes incorporated by <br />reference into the Santa Ana Municipal Code (other than <br />Ordinance No. NS-1998 which shall be applicable <br />regardless ofany subsequent changes); <br /> <br /> (3) Laws, including zoning code provisions, which <br />regulate the manner in which business activities may be <br />conducted or which prohibit any particular type of <br />business activity on a City-wide basis; and <br /> <br /> (4) Procedural rules of general City-wide <br /> application. <br /> <br /> Conflicting laws and regulations shall include, without <br />limitation, any matters which: <br /> <br /> (1) shall limit, restrict or reduce the density <br />or intensity of development or any component part of <br />the development or otherwise require a reduction in the <br />total square footage of the proposed buildings and <br />improvements; <br /> <br /> (2) shall limit the timing or phasing of the <br />Project(s); or <br /> <br /> (3) which are not uniformly applied on a City- <br />wide, good faith and non-discriminatory basis to all <br />substantially similar projects. <br /> <br /> (e) Subsequent "Slow/No Growth" Measures. Consistent <br />with (a) and (b), above, the City and Developer specifically <br />agree that any subsequently enacted initiatives, referen- <br />dums, or amendments to the City's General Plan and/or Zoning <br />Code which contain "slow/no growth" measures or which by <br />their terms are intended to, or by operation have such <br />effect or which otherwise conflict with the terms of this <br />Agreement or limit the timing and phasing of the Project(s) <br />shall have no application to the Project(s). Notwithstand- <br />ing any such measures, the mitigation measures required for <br />the Project(s) are limited to those established by this <br />Agreement. <br /> <br />12 - <br /> <br /> <br />