My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2042
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1989 (NS-1992 - NS-2046)
>
NS-2042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:03:32 PM
Creation date
6/26/2003 10:08:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2042
Date
12/20/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> <br />Impact Topic and Impacts <br /> <br />EIR HITIGATION HEASURES <br /> Proiect Impact Summary <br /> <br />Mitigation Measures <br /> <br />Level of I.mpact <br />After Mitigation <br /> <br />Land Use <br /> <br />· The proiect is not consistent with the City's General Plan <br />designiation for the site; however, it is compatible with <br />surrounding commercial land uses. <br /> <br />· Grant the project a General Plan amendment increasing <br />the allowable FAR from 0.5:1 to 1.5:1. <br /> <br />Not significant <br /> <br />Traffic end Circulation <br /> <br />· The proposed project would generate an additional Q [3492] <br />average daily trips {AD'r). <br /> <br />[* Of the 12 studied intersections, Tustin Avenue/17th <br />and Tusti~/4th would operate unacceptably with the proposed <br />project. Their Levels of Service (LOS) would range from <br /> 'E.' to 'F' with the proposed project. All other <br /> studied intersections would operate acceptably <br /> with the proposed proiecL] <br /> <br />· The applicant shall prepare a Transportation Demand Mangemant <br />(TDM) Program the obiective of which is to maintain a 30 % <br />employee participotion rate in work communte alternatives. <br /> <br />· As part of the TDM program, the applicant shall construct a bus <br />turnout on Tustin Avenue in front of the projec site. <br /> <br />· The applicant shall fund the widening of Tustin Avenue on the east <br />side adjacent to the proposed project site. This would allow for the <br />construction of a separate right turn lane. <br /> <br />· The applicant shall share funding the installation of eastbound- <br />westbound dual left turn lanes on 17th Street. <br /> <br />Not Significant <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.