Laserfiche WebLink
Impact Topic .and Impacts <br /> <br />Air Quality (Continued) <br /> <br /> EXHIb ~.T E <br /> <br />EIR MITIGATION MEASURES <br /> <br />ProJoct Impact Summary (cont) <br /> <br />Mitigalion Measures <br /> <br />. A Transportation Systems Management (TSM) Plan (or the <br />proposed proiecl shall be developed by the applicant. <br /> <br />. Bicycle racks shall be constructed on-site lot use by employees <br />and palrons. <br /> <br />. Improved transit lacilities on the project site <br />shall be construcled by the applicant. Such <br />facililies shall include covered and lighted bus stops with turnout bays <br /> <br />. Safe pedeslrian walks between buildings and <br />bus stops shall be constructed on.site by the applicant to encourage <br />Iransil use. <br />. Transportalion improvements such as road widening, signal <br />synchronization, intersect[on widenings, etc. shall be <br />conslructed by Ihe appicant as required by the City ol aanla Aha. <br /> <br />. CarNan pooling program shall be implemenled Ihrough <br />employment of a permanenl on-sile pooling coordinalor <br /> <br />. Preferred parking shall be provided in the parking <br />slruclure lot those who use Ihe pooling program. <br />Signage to thai allect shall be Inslalled and maintained <br />by the al3plicant. <br /> <br />Level of Impacl <br />Alle~ Mitigation <br /> <br /> <br />