Laserfiche WebLink
Impact Topic and tmpacfs <br /> <br /> EXHIBIT ~ <br /> <br />EIE HITI6ATION N~ASUEES <br /> <br /> CumulaHve Impact Summary <br /> <br /> ~itigalion <br /> <br />Level ol Impact <br />Al~or Mil~g~don <br /> <br />Land Uae <br /> <br />, Project Implementation would contribule Io the lunhor <br />conversion Of underdeveloped land in the Courtly to a <br />developed stale. <br /> <br />Traffic end Circulation <br /> <br />, Cumulative traffic volumes will reduce Ihe LOS at the Tustin <br />Avenue/17th Street intersection to 'F' during the a.m. and p.m. <br />peak hours. Other studied Intersections would conlinue to operale <br />acceptably, <br /> <br />Air Quality <br /> <br />, The Implementation o! the cumulative <br />projects would contribute to shod.term padiculale <br />levels during conslruction and would increase Iha <br />long larm amount O! pollutants. <br /> <br />, No moasuros are roquirod. <br /> <br />· The applicant shall conlribute fair.share lunding to the <br />following: <br />, The applicant shall prepare a TDM plan for the City and <br />shall parlicipate in such a program wilh other employers in <br />Ihs area, <br /> <br />· Al 17th and Tusfin, provide dual left lurn lanes, three through <br />lanes and separate right turn lanes on each approach to Ihs <br />intersection. <br />· Inslallalion of a median in Tuslin Avenue belween the project <br />driveway and 17th Street, <br /> <br />· No mitigation measures are reasonably feasible Io mitigate <br /> this projects cumulative impact of Irallic. <br /> <br />Nol Signiflcanl <br /> <br />Signilicanl <br /> <br />Significant <br /> <br /> <br />