Laserfiche WebLink
EXHIBIT E <br /> <br />EIR HITIGATION NEASURES <br /> <br />Impact Topic and Impacts <br /> <br />Public Servlcee <br /> <br />Cumulative Impacl Summary (cent) <br /> Mitigation Measures <br /> <br />Lol~ul el Imp3ct <br />A[ler Mitigation <br /> <br />Fire Protection <br /> <br />, The construction and operations of the <br />cumlatlve prelect set would increase demands on <br />City Fire Deparlment resources. This Is due to Ihe lact <br />Ihat the number of Inspectors are limited <br />and ere riel keeping up with Ihe pace o[ <br />developmenL As a result, lime delays are occudng Ihal <br />ere slowing up the inspection and ultimate <br />clearance of prelects that have already been <br />approved by the City. In addition, due to a lack el high <br />rise related lire fighting equipment end associamd <br />manpower, the construction of high.rise <br />building that is occuring Is significantly <br /> Impacting the Fire Oepartmenl's abillly to provide <br /> adequate protection I0 such buildings, <br /> <br />· Other than Ihose measure lisled lot project traffic and lire <br />proleclion, no additional measures are required, <br /> <br />Not Significant <br /> <br />, Cumulalive development would resull in unavoidably signilicanl <br />traffic Impacts al the Tuslln Avenuo117 Slroet intersection. <br />Tho tesulling congeslion would signillcanlly Impacl lh,~ Fire <br />Oepetlmant as Iheit response limos IO cedain podions el Ihe City <br />would increase, <br /> <br />. OIher than those measures already lisled which locus on <br />reducing trallic congestion al Iho Imersecfion, no other measures <br />are considered Ioasible. <br /> <br />Significanl <br /> <br /> <br />