Laserfiche WebLink
'548 <br /> <br />Regular maintenance and street sweeping shall be conducted. <br />Planters and landscaped areas shall be maximized. A grading <br />permit shall be obtained and grading shall be in accordance <br />with PacifiCenter improvement plans. A subsurface <br />investigation shall be conducted to document perched <br />groundwater, and if required subdrainage systems shall be <br />used. In addition, aquifers shall be dewatered and subgrade <br />slabs and walls shall be waterproofed if necessary. <br /> <br />Findings= The mitigation <br />completely mitigate impacts <br />perched groundwater. <br /> <br />measures described above will <br />related to erosion, runoff and <br /> <br />VII. PUBLIC SERVICES AND UTILITIES <br /> <br />Effects: <br /> <br />Firs: Short-term increased demand for fire <br />during construction. Increased risk of fire <br />injury and other emergencies. <br /> <br />inspectors <br />and bodily <br /> <br />Police/Security: Increased number of thefts and violations <br />related to increased human activity in the project vicinity. <br />Increased numbers of accidents and vehicular violations. <br /> <br />Emergency Medical: Increased <br />emergencies and safety impacts <br />injury. <br /> <br />potential for medical <br />due to fire and bodily <br /> <br />Sewers The project will contribute to significant <br />cumulative impacts to the County sanitation system. <br /> <br /> The applicant should employ an on-site Fire <br />Inspector. Zmergency access shall be provided to all <br />portions of the site during project construction if <br />feasible. Fire hydrants shall be in operating order if <br />feasible during project construction. <br /> <br />Polioe/Security: Arena management/events promoters shall <br />coordinate with the City Police Department to provide <br />adequate security and protection according to specific <br />mitigation measures listed in the Draft EIR. <br /> <br />Emerganoy Medioal: Arena management/events promoters shall <br />provide emergency medical staff for all events according to <br />specific mitigation measures listed in the Draft EIR. <br /> <br />Sewers A flow test will be carried out by the developer to <br />ensure adequate capacity. If required, the developer shall <br />pay all necessary fees and make all necessary improvements. <br /> <br />-4- <br /> <br /> <br />