My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2089 - Rezoning Certain Properties
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1990 (NS-2047 - NS-2104)
>
NS-2089 - Rezoning Certain Properties
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:03:20 PM
Creation date
6/26/2003 10:08:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2089
Date
10/15/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAf'r (August 7, 1990) <br /> <br />TRAFFIC/CIRCULATION <br /> <br />lS. <br /> <br />With the first building permit for the proposed project, the project applicant shall <br />construct a traffic signal at the intersection of Susan Street/Sunflower Avenue in <br />accordanc~ with standard traffic signal warrants. Under the lerms of a pending <br />reimbursement agreement between thc cities of Santa ,Sma and Costa M~sa, thc <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually be rcimburse, d for all but thc 'fair share' of the signal costs associated with <br />thc proposed Lake Center project. <br /> <br />Timing of Implementation/Verification: <br />Melhod of Verification: <br /> <br />Concurrent with first building permit <br />construction <br /> ,, <br /> <br />Improvcmcnt~ plan check and field <br />inspection <br /> <br />Bcsponsible Parties: <br />Verification (Name & Dale): <br /> <br />Manager, Engineering Ser~ce~ <br /> <br />19. <br /> <br />The project applicant shall install multiway (4.way) ~stop" signage at the intersection <br />of Lake Center and Susan Street. <br /> <br />Timing of Implementation/Verification: Prior to first building permit issuance <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Panics: <br /> <br />Vg:rjfication (Name & Dale): <br /> <br />Sr. Plan Check Engineer, Building DMsion <br />& Manager, Engineer Services <br /> <br />20. <br /> <br />The project applicant shall post a faithful performance bond for the future installation <br />of a traffic signal at Lake Center and MacArthur Boulevard. This intersection shall <br />be monitored as the project is constructed for satisfaction of signal ,,,.,arrant <br />requirements and the signal shall be installed as warranted. <br /> <br />Timing of Implementation/Verification: Prior to grading permit issuance <br /> <br />Written evidence provided by applicant <br /> <br /> Sr. Plan Check Engineer, Building DMsion <br />· & Manager, Engineer Services <br /> <br />Verification (Name & Date'S: <br /> <br />885MMP 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.