Laserfiche WebLink
<br />, <br /> <br />101 <br /> <br />7. Subsection (b)( l) (Developer I s Obliqations - Cabrillo <br />Park Drive) of Section 9 (Mitiqation Measures) of the Agreement is <br />hereby deleted in its entirety and the following is substituted in <br />lieu thereof: <br /> <br />(l) Cabrillo Park Drive <br /> <br />(i) Cabrillo Park Drive Plans. Developer agrees to <br />commence immediately and diligently prosecute to <br />completion the final plans and specifications (the <br />"Cabrillo Park Drive Plans") for the completion of <br />Cabrillo Park Drive between First Street and Fourth <br />Street adjacent to Phase II and Phase III of the <br />Property. <br /> <br />(ii) Cabrillo Park Drive Improvements. Developer <br />shall construct at its sole cost and expense the <br />following improvements to Cabrillo Park Drive (the <br />"Cabrillo Park Drive Improvements"): sub-base and asphalt <br />pavement, full sidewalk on the west side, curbs and <br />gutters on both sides, a landscaped median, street <br />lighting on both sides, installation of a westbound left- <br />turn lane, installation of traffic signals at the <br />southerly and northerly access points on Cabrillo Park <br />Drive, drainage facilities as required, parkway <br />landscaping on both sides and necessary signing and <br />striping. Developer shall also be responsible for <br />installing in Cabrillo Park Drive laterals with stubheads <br />for future water and electical service for the <br />landscaping irrigation on the east side of Cabrillo Park <br />Drive adjacent to the Kaiser property. The Cabrillo Park <br />Drive Improvements shall meet but not be required to <br />exceed published minimum City standards for comparable <br />arterial streets within the city (for example, the <br />portion of Cabrillo Park Drive adjacent to Phase I). <br />city and Developer agree that the City shall use its best <br />efforts to have Caltrans install traffic signal <br />improvements at Fourth street and Cabrillo Park Drive in <br />accordance with ultimate design. Developer shall be <br />responsible for the cost or the actual installation of <br />any traffic signal improvements at Cabrillo Park Drive <br />and Fourth Street not provided by Caltrans. The City <br />shall work with Caltrans to ensure the timely completion <br />by Caltrans of all permanent traffic signal improvements <br />at Cabrillo Park Drive and Fourth street. The City shall <br />also cooperate with Developer to cause the Sanitation <br />Districts of orange county to confirm that there is no <br />need to relocate the sewer line within Cabrillo Park <br /> <br />4 <br />