Laserfiche WebLink
MITIGATION MONITORING PLAN I.MPLE.MEN-f'ATION <br /> <br /> [n the foilowing MMP. eacS. mitigation measure included in [he EIR is tisted by resourc~ <br />area. Implementation or'most mitigation measures in this plan is the responsibility, orr. he Discovery <br />Science Center, with oversight and verification by the City,. <br /> <br /> Certain inspechons and reports require preparation by qualified individuals, and these are <br />specified as needed. The timing and me,od of verification are provided with/n this plan, along with <br />the parties responsible for implementation and monitoring of the mitigation measure to determine <br />whether the measure has been satisfactorily implemented. Satisfactory implementation of a <br />mitigation measure is to be indicated through the use of the compliance verification form, which <br />must be signed by the responsible party(s) upon completion. <br /> <br />549 <br /> <br /> <br />