Laserfiche WebLink
175 <br /> <br />of any public street, alley, sidewalk or other public place at any location, <br />other than that described in the application for the excavation permit and as <br />shown on the plans filed with the director, and in accordance with the <br />requirements of the permit. If the circumstances appearing after the <br />excavation is commenced make it impossible to comply with the permit, the <br />director may grant a waiver to take the circumstances into account. <br /> <br />(b) <br /> <br />Failure to comply with requirements set forth in this Chapter or on any <br />permit shall be cause for revocation of the permit until the violations have <br />been corrected or alternative requirements have been approved by the <br />director. <br /> <br />Section 33-32.5 Restoration of Pavement, Traffic Loops, and Pavement Markings. <br /> <br /> Restoration of the asphalt pavement, traffic loops, pavement markings, legends <br />and stripes of any street, alley or other public place shall be performed by permittee. <br />Nothing in this section shall relieve the person opening or tearing up any pavement from <br />the responsibility to maintain the excavation or installation in a safe condition until it is <br />repaved or otherwise restored. <br /> <br />Section 33-32.6 Opening, Backfilling and Paving Trenches. <br /> <br />(a) <br /> <br />No trench shall be opened in any street for the purpose of laying pipes, <br />conduits or ducts more than four hundred (400) feet in advance of the pipe, <br />conduit or ducts being placed in the trench, except when the prior written <br />consent of the director has been obtained. <br /> <br />(b) <br /> <br />Each permittee shall cover open excavation with non-skid surface steel <br />plates ramped to the elevation of the contiguous street, pavement or other <br />public right-of-way or otherwise protected in accordance with guidelines <br />prescribed by the department. <br /> <br />(c) <br /> <br />All excavations shall comply with the standards and requirements <br />established by the director for compaction, backfill and pavement <br />restoration. The standards and requirements may impose different <br />requirements for different excavations, taking into consideration relevant <br />factors, such as (i) the location, type and extent of excavation performed (ii) <br />the condition of the surface being excavated, (iii) the period of time elapsed <br />since the construction or most recent resurfacing of the surface being <br />excavated, and (iv) the average daily traffic volume and truck volume. <br />Permanent pavement restoration shall be completed no later than two (2) <br />weeks after the trench is backfllled; provided, however, that the Director <br />may grant an extension depending on the complexity of the work and <br />testing which is demonstrated to be necessary to get the utility in service. <br /> <br />(d) The old torn up pavements and other rubble shall be removed, together <br /> with any surplus excavated material, within one (1) working day from the <br /> <br />Ordinance No, NS-2447 <br /> Page 5 of 12 <br /> <br /> <br />