Laserfiche WebLink
Impact Topic and impacts <br /> <br /> EXHIB~£ E <br /> <br />EIR MITIGATION MEASURES <br /> <br />Project Impact Summary (cent), <br /> <br />Mitigation Measures <br /> <br />Level of Impact <br />After Mitigation <br /> <br />-Solid Waste <br /> <br />· Demolition of existing site structures would result in a short- <br />term increase in the amount of sel[d waste that would be <br />generated on-site. <br /> <br />· Operation of the proposed proiect would result in a long-term <br />increase in the amount of solid waste that would be generated <br />on tho project site. SpeclflcaIly, an additional 14,341,800 lbs <br />per year would be disposed of at Bee Canyon Landfill. <br /> <br />Public Servlcea <br /> <br />-Fire Protection <br /> <br />· Const~Jction o[ tho proposed project would significantly impact <br />tho City Fire Department as increased demands would be placed <br />on Fire Department inspectors [and Plan Checkers]. <br /> <br />· None required. <br /> <br />· Trash separation and recycling programs shall be encouraged <br />on-site to decrease the amount of solid waste that would be <br />generated by the proposed project. - (Recommended as Part <br />of Ihis EIR. <br /> <br />· Prior to dlspos~n9 of construction debris that would be <br />generaled by removal of existing site structure, it shall be <br />checked to the satisfaction of the City for the presence el asbestos. <br /> <br />· Fair share funding shall bo provided by this applicant for tho <br />provision of additional personnel to enhance the Fire Deparlments <br />ability to provide plan check and site inspection services. <br />· [As an option to the above,] the applicant ~] [could] employ, [or <br />provide the City with funds for,] an on-site Deputy Fire Inspector <br />for all required fire inspections during construction [and could fund <br />a Fire Department Plan Checker. <br /> <br />Not Signi~cant <br /> <br />Not Signlflcant <br /> <br />Not Significant <br /> <br /> <br />