Laserfiche WebLink
In Re <br /> <br />~esolution of Awmrd <br /> <br /> No. 1214 - Polnset~n <br /> <br /> btr~et Sewer. <br /> <br />In ne <br /> <br />A%solution of Awnrd No.1215 <br /> <br />heat ~econd Street. <br /> <br /> Lyes: <br /> <br /> Noes: <br /> <br /> Lbsent: <br /> <br />%¥~s being <br /> <br />Trustees <br /> <br />Trustees <br /> <br /> Trustee Nat <br /> <br />1213 and ~ ssed by th, following vote: <br /> <br /> C.H. Ch~pman, <br /> E.B.Collier, <br /> <br /> None. <br /> <br /> H. Neff'. <br /> <br />Oeo. ~ePhee, <br />J. W. Tubbs. <br /> <br /> the t~me ~nd rlace fixed for the opening of <br />bids or proposmls for the work ordered done and Improve- <br />ment ordered mede upon ond along n portion of Poinsettia <br />Street, briefly described ~n Resolution of Intention No. <br />llSV, ~nd the Board of Trustees being now in session <br />proceeded to and did publicly open, examine ~nd declare <br />all bids re~e~ved. Bids were received as follows: <br /> <br /> Item 1. 'Zhe trenching, furn~shln~ snd ~aying of six <br /> (~) inch main sewer complete with the furnishing of <br /> all necessary equipmeot and material .nd the back- <br /> filling of trench on an estimate of 889.7 line.r feet. <br /> <br /> Item 2. The excavation for nnd the construction of three <br /> (5) m~nholes comnlete witP the furnishing of ~ 1 <br /> <br /> necessary equipment <br /> <br />G. ~. ~ucetich <br />~ells & Bressler <br />Pernel Barnett <br /> <br />~he Board of Trustees <br /> <br />~nd, m~ teri. 1. <br /> <br />Item 1 $1.0~ Item ~ $60.each <br />· V5 95. " <br />.~4 VO. " <br /> <br />thereupon rejected all bids except <br /> <br />the bid hereinafter mentioned nnd awarded the contract <br />to Pernel Bnrnett for the ~rk or i~rove~ent ns the lowe <br />respon~ble bidder therefor, ~t the rrlce nnmed in Tis <br /> <br /> Trustee ~'cPhee then introduced ~ resolution ~ward~ng <br />contract to Pernel B~rnett. The resolution was ordered <br />fi]ed, read, considered, designated Resolution of Award <br />No. 1214 and passed by the following vote: <br /> <br /> Ayes: Trustee~ C.H.Chapman, Geo. McPhee, <br /> E. B. Collier, J. W. Tubbs. <br /> <br /> Trustees None. <br /> <br /> H, Neff. <br /> <br /> Noes: <br /> <br /> Absent: Trustee Nat <br /> <br />T!~Is be~mg the time ~nd place fixed for the <br />bids or proposals for the work ordered done <br /> <br />oreninF of <br /> <br />improve- <br /> <br />merit ordered mode upon nnd nlong ~ portion of ~est Second <br /> <br />btreet, briefly descr'bed in Resolution of Intention No. <br /> <br />1189, and the Board of Trustees be~n; now in session <br /> <br />proceeded to and did publicly open, examine ~nd declare <br /> <br />nil ~Ids received. 5ids were received as follows: <br /> <br />Item 1. ~I~e regr~dlnm to s sub-grade o~d the laying <br />of five (5) Inch con,rate pavement with belt finish <br />we~rlng surface, complete with the furn~sbin~ of ,Il <br />necessary equipment, labor ~nd material on an estimate <br />of 105,085 linear feet. <br /> <br />Item 2. %~e construction of concrete curb complete <br />wfth the furnishing of all necessary equipment, labor <br />~nd m~terial on an estimate of 2121.8 linear feet. <br /> <br />Item Z. i~e trenching, furnishing and laying of <br />eighteen (18) four (4) inch house bt. rich sewers from th~ <br />mnin sewer to the curb line complete with the furnish- <br />~nc of all necessary equipment, labor ~nd m~terial on <br />estlmete of ~24 l~near feet. <br /> <br /> <br />