My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1925
Clerk
>
Minutes
>
CITY COUNCIL
>
1886-1951
>
1925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:29:37 PM
Creation date
4/9/2003 4:39:57 PM
Metadata
Fields
Template:
Pre-Charter
Year
1925
Pre-Charter - Doc Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In Re <br /> <br />Bids <br /> <br />Hesperian Street. <br /> <br />~hls being the time and place fixed and set forth <br />for tbs openln~ of bids or rroposals for the improve- <br />ment of , portion of ~esperlan Street as briefly <br />described in Resolution of Intention No. 141V, and tbs <br />Board of Trustees hein~ d,~]y eon-ened in ones 8eselon, <br />proceeded to a~d did publicly open, examine and <br />declare all bids reoelved, as follows: <br /> <br /> Item 1. Th.e grading to s subgrade and the laying of <br />a five (~) inch Portland Cement Concrete Pavement, <br />complete with tbs furnlehlng of all necessary equip- <br />ment, labor and material on an estimate of 39,273.48 <br />square feet. <br /> <br /> Item 2. The excavation for nnd the construction of <br />cement concrete cu~.b complete with t~e furnlshlne of <br />all neoessar2 equipment, labor and material on an <br />estimate of 1014.88 linear feet. <br /> <br /> Item 8. ~he excavation for and ~he o,netruc~ion of <br />three and one-half (3~) inch cement concrete side- <br />walk complete wit~ t~e f~r~Isbln~ o~ a~l necessary <br />equipment, labor and mater~sl on an estimate of <br />4~21.0~ square feet. <br /> <br /> Item 4. The excavation for and tbs construction of <br />five (~) inch cement concrete driveway sldewslk <br />complete with the fut,~iehing o~ all nesessary equip- <br />ment, labor and material on an estimate of 280 square <br /> <br /> feet, <br />Contractor Item 1 Item ~ Item 8 Item 4. <br />Fry Bros. Contracting Co. $0.1~8 0.50 0.]6 0.20 <br />Frank Russell & 0o. 0.1V9 0.50 0.1~ 0.~0 <br />~dw. W. Dahl 0,188 0.82 0.188 0.19 <br />B. R. For~ 0.18-8/8 0.80 0.l~ <br />Oriffith Company 0.1~ 0.50 0.18 0.18 <br /> <br />T. W. 0gleshy 0.1V5 0.50 0.18 <br /> <br /> On motion of ?rustee Puri~ton, seconded by <br /> <br />Chapman and carried, bide were referred to t~e <br />E~lneer for check~ng, to report st next meeting <br />of the Board. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.