Laserfiche WebLink
RESOLUTION NO. ~2-~. <br /> <br /> A Resolution Designating the Building Inspector of <br /> the City of Santa Ana as Construction Inspector <br /> in Charge of and Representing the City on the Con- <br /> struction of the Central Fire Station and Authoriz- <br /> ing the Adoption of Change Orders on this Project <br /> by Signature of the City Administrator, Fire Chief, <br /> and Building Inspector Not to Exceed the Total <br /> Amount of $200.00 in Each Such Change Order. <br /> <br /> ~HEREAS, the City of Santa Aha has entered into a con- <br />tract for the construction of an Headquarters Fire 8ration <br />located on the Southeast corner of Walnut and Sycamore ~treets <br />within the City; and <br /> <br /> Wh~EA8, the interest of the City requires that continuous <br />technical inspection and supervision be given to ~his construc- <br />tion project by some qualified person or persons representing <br />the City; and <br /> <br /> ~EREA$, during the period of construction there will be <br />an indeterminate number of problems requiring consideration of <br />proposed changes in construction plans and procedures which will <br />involve additional costs for the City and which must be determined <br />immediately in order to avoid costly delays; <br /> <br /> NOW, THEREFORE, BE IT RESOLVED: That the City Council <br />does hereby designate the Chief Building Inspector of the City <br />of Santa Aha, and any other person who may from time to time be <br />directed by him to act in his behalf, as the inspector for the <br />City on this construction project; <br /> <br /> AND BE IT FURTHER RES0LVED: That the City Council hereby <br />authorizes a committee consisting of the City Administrator, the <br />Chief Building Inspector and the Chief of the Fire Department to <br />approve any changes in the construction plans and procedures which <br />are in the joint opinion of the committee necessary for the <br />economical construction of the Fire Station and which do not in <br />each separate instance exceed an increase of ~wo hundred ($200.00) <br />dollars in the construction costs of the project. <br /> <br /> <br />