My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927
Clerk
>
Minutes
>
CITY COUNCIL
>
1886-1951
>
1927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:29:46 PM
Creation date
4/10/2003 10:24:29 AM
Metadata
Fields
Template:
Pre-Charter
Year
1927
Pre-Charter - Doc Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open session proceeded to and did publicly open, <br /> <br />examine and declare all bids received as follows: <br /> <br />Item No. 1. The ~renching, furnishing, and laying <br />of twenty (20) inch diameter reinforced concrete <br />main sewer, complete with the furnishing cf all <br />necessary equipment, labor and material for the <br />sum of $ _ per linear foot. <br />Item No~ 2. The trenching, furnishing and laying <br />of twenty (20) inch diameter concrete main sewer <br />complete with the furnishing of all necessary <br />equipment, labor and material for the sum of $__._~ <br />per linear foot. <br />Item No. 8. The trenching, furnishing and laying <br />of sixteen (18) inch diameter cast iron main sewer <br />complete with the furnishing of all necessary <br />equipment, labor and material for the sum of $ _ <br />per linear foot. <br />Item No. A. The trenching, furnishing and laying <br />of sixteen (16) inch diamSter reinforced concrete <br />main sewer, complete with the furnishing of all <br />necessary equipment, labor and material for the <br />sum of $ per linear foot. and layin! <br />Item No. 5.. The trenching, furnishing, <br />of sixteen ~lS) inch diameter concrete, main sewe~ <br />complete with the furnishing of all necessary <br />equipment, labor and material for the sum of $ <br />per linear foot.'. <br />Item No. 6. The trenching, furnishing and laying l <br />of eight (8) inch d~iameter concrete main sewer, <br />complete with the furnishing of all neeessary~ <br />equipment, labor and materi~l for the sum of ~ <br />per linear foot. <br />Item No. 7. The trenching, furnishing and laying <br />of six (6) inch diameter main sewer, complete with <br />the furnishing of all necessary equipment, labor <br />and material for the sum cf $ per linear foot. <br />Item No. 8. The excavation fo-~--~"nd the construe- <br />tlon of one reinforced concrete structure accord- <br />ing to detail Nc. 1. complete with the furnishing <br />of all necessary equlp~ent, labor and material fo~ <br />the sum of ~ complete. <br />Item No. ~.~excavation for and the construc- <br />tion of one reinforced concrete ~truoture accord- <br />ing to detail No. 2. complete with ~he furnishing <br />of all necessary equipment, labor a nd material for <br />the sum of $ complete. <br />Item No. 10. The e~cavation for and the construc- <br />tion of one reinforced concrete structure accord-' <br />lng to detail No. 8. complete with the furnishing <br />of all necessary equipment, labor and material for <br />the sum of $ complete. <br />Item Nol 11. T~e excavation for and the construe-' <br />tion of one reinforced concrete structure accord- <br />ing to de,ail No. t. complete with the furnishing! <br />of all necessary equipment, labor and material for <br />the sum of $ complete. <br />Item No. 12. The excavation for and the construe-! <br />tion of one reinforced concrete structure accord- <br />lng to detail No. $. complete with the furnishing! <br />of all necessary equipment, labor and material fo~ <br />t~e sum of $ complete. <br />Item No. 13. T~e excavation for and the construe-! <br />tion of one reinforced concrete structure accord- <br />ing to detail Nc. 6, complete with the furnishing~ <br />of all necessary equipment, labor and material <br />the sum of $ complete. <br />Item No. IA. Tl~e excavation for and the cons truc-i <br />tion of one reinforced concrete structure accord- <br />lng t o detail No. V. complete witht he furnishingi <br />of all necessary equipment, labor and material <br />the sum of $ complete. <br />Item No. 1§. The excavation for and the conatruc-i <br />tion of one reinforced concrete structure accord-' <br />lng to detail Nc. 8. complete with the furnishing i <br />cf all necessary equipment, labor and material <br />the sum of $ complete. <br />Item No. 16. T~e excavation for and the construe- <br />tion of one reinforced concrete structure accord- <br />ing to detail No. ~, complete ~th the furnishingi <br />of all necessary equipm~t, labor and mater~al <br />the s~ of $ complete. <br />Item No. 1V. T~e excavation for and the construe-; <br />tion of one reinfm, ced concrete structure accord- <br />lng to detail No. 10. complete with the furnishin~ <br />of all necessary e~uipment, labor and material fo~ <br />the sum of $ complete. <br />Item No. 18. The excavation for and the construc-i <br />ticn of one reinforced concrete structure accord- <br />lng to detail No. 11. complete w~ththe furnishingI <br />of all necessary equipment, labor and material for! <br />the sum of $ complete. <br />Item Nc. 19. The excavation for and the oonstruc-i <br />tion of one reinforced concrete structure accord- <br />lng to detail No. 12. complete with the furnishin~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.