Laserfiche WebLink
C~st Iron Pipe & Foundry <br />Prices F.O.B. San Pedro. <br /> <br />B. N~coll & Company <br /> <br />20" Elbow bell both ends standard "B" <br />20" Tee tl~]l both ends standard "B" <br />14"x~" teo be].] both ends standard "B" <br />20" sleeve for 20" B~,.S pipe <br />20" Plug "a" <br />14" Sleeve for 14" B&S pipe "B" <br /> <br />$50.40 ea. <br /> 58.85 " <br /> 27.50 " <br /> 20 . 68 " <br /> 8.36 " <br /> 12.10 " <br /> <br />CO. <br /> 26V0' of 14" Class "B" B&S Cast Iron P~pe in <br /> 12~ lenghths, to fill the requirements in the <br /> standard specifications of the ~.W.W.A. and to <br /> fill the require~ents of the specifications <br /> accompanying your request for bids ~ 2.765 <br /> 264~ of 16" Class "? B&S Ditto 2.56 <br /> 5V6~ of 20" Clas.~ "B" B&S Ditto 3.87 <br /> Flanged Cast Iron Fittings as listed in your <br /> specif ~ cations ................ a ......... <br /> B&S Cast Iron Fittings as listed in your <br /> specificat~ ors .......................... <br /> Alternate Bid <br /> ~Class 100 deLsvaud Centrifugally <br /> C~st, cast iron pi}:e B&S in 12' lengths .... <br /> 264' of ]8" Ditto .......................... <br /> 57~' of 20" Ditto .......................... <br /> <br />perft. <br />per ft. <br />per ft. <br /> <br />.10 rer lb. <br /> <br />· 05 " " <br /> <br />1.91 per ft. <br />2. 328 " " <br />3.312" " <br /> <br /> Cast Iron Bell and Spigot Pipe <br /> 564 feet 20" class"B" to ~,,eigh 175~ per ~'oot <br />264 " 16" " "A" " " 108.3# " " <br />26?0 " 14" " "~" " " 102.5# " " <br /> Price on all items ~2.40 per ton of 2,000 pounds <br /> incoming steamer dock Los Angeles Harbor. <br /> <br />f.o.b. <br /> <br />On motion of Trustee Chapman, seconded by Collier and car- <br /> <br />tied, all bids were referred to the Water Superintendent <br /> <br />and City Engineer for checking to report back at the next <br /> <br />meeting. <br /> <br /> [n Re <br /> <br />Resolution of Award <br /> <br />No. 1743 - F~uit Street. <br /> <br />This being the time and place ant forth for the opening of <br /> <br />bids or proposals for the improvement of a portion of Fruit <br /> <br />Street, as b~ief]y described in Resolution of Intention No. <br /> <br />1725, and the Board of Trustees being duly convened in open <br /> <br />session, proceeded to open, examine and declare all bids <br /> <br />received as follows: <br /> <br />Item 1. The ~rading to a subgrade and the laying thereon of <br />a six (6) inch asphaltic concrete pavement, complete with <br />the furnishing of all necessary equipment, labor and mater- <br />ial for the sum of $ per square foot. <br />Item 2. The grading to a subgrade and the laying thereon <br />of a five (5) inch asphaltic concrete ~ vement, complete <br />with the furnishing of all necessary equipment, labor and <br />material for the sum of $ per square foot. <br />Item $. The excavation for an~e construction of cement <br />concrete curbs, complete with the furnishing of all races- <br />sary equipment, labor and materials, for the sum of $. <br />per lin. foot. <br />Item 4. The excavation for and the construction of cement <br />concrete sidewalks having a total thickness of three and <br />one-half (3~) inches, complete with the furnishing of all <br />necessary equipment, labor ,nd materials, for the sum of <br />$ per square foot, <br />Item 5. The excavation for and the construction of cement <br />concrete sidewalks having a total thickness of five (5) <br />inches, complete with the furnishing of all necessary equip- <br />ment, labor and materials, for the sum of $ per sq.ft. <br />Item 6. The trenching, furnishing and laying~six (6) <br />inch diameter main sewer, complete with the furnishing of <br />all necessary equipment, labor and material for the sum of <br />$ per linear foot. <br />Item 7. ~fhe trenching, furnishing and laying of four (4) <br />inch diameter House Connecting Sewers, complete with Ehe <br />furnishing of all necessary equipment, labor and material <br />for the sum of $ ..... per lln. foot. <br />Item 8. The excavation for end the construction of Concrete <br />Sewer ~anholes, complete with~he furnishing of all necessa- <br />ry equipment, labor and material for the sum of $ each. <br />Item 9. The excavation for and the constructlon O-~ncrete <br />Sewer Flushtank, complete with the furnishing of all neces- <br />sary equipment, labor and material for the sum of $ ea. <br />Item 10. The excavation for and the construction of one <br />reinforced concrete culvert, complete w~h the furnishing <br />of all necessary equipment, labor and material for the sum <br />of $ complete. <br /> <br /> <br />