Laserfiche WebLink
226 <br /> <br />In Re ~ <br /> <br />Reso. of Award <br /> <br />No. 19OS-,Water Accessories. <br /> <br /> In Re <br /> <br />Reso. of Award <br /> <br /> 1909 - Valves. <br /> <br />In Re /~ <br />Reso. of Award <br /> <br /> No. 1910 - Seventh St. <br /> <br />This being the time and place to which action was defer- <br />red on the bids or proposals for water pipe and acces- <br />sories, Trustee Goode introduced a resolution awarding <br />the contract to the Water Works Supply Company at the <br />total price of $S95.90. The resolution was ordered <br />filed, read, considered, designated Resolution No. 1908 <br />and passed by the following vote: <br /> <br /> Ayes, Trustees J.L. McBride, W.J. Kelly, W.G. Knox, <br /> Stanley E. Goode, F.L. Purinton. <br /> <br /> Noes, TrUstees None. <br /> <br />Absent, Trustees None. <br /> <br />~hia being the time and place to which action was defer- <br />red on the bids or porposals for water pipe and accesso- <br />ries, a resolution was introduced awarding the contract <br />for certain valves to ~tth Booth Usher Company at the <br />total price of $823.25. The resolution was ordered <br />filed, read, considered, designated Resolution No. 1909 <br />and passed by the following vote: <br /> <br /> Ayes, Trustees J.L. McBride, W.J. Kelly, w'.G. Knox, <br /> <br /> Noes, T~stees <br />Absent, Trustees <br /> <br />Stanley E. Goode, F.L. <br /> <br />None. <br /> <br />None. <br /> <br />Purtnton. <br /> <br />This being the time and place fixed for the opening of <br /> <br />bids or proposals for the work ordered done and improve- <br /> <br />ment made upon a portion of Seventh Street and briefly <br /> <br />described in Resolution of Intention No. 1910, aud the <br /> <br />City Council being duly convened in open session procee- <br /> <br />ded to and did publicly open examine and declare all <br /> <br />bids received as follows: <br /> <br />Item Ne. 1. The trenching, furnishing and laying of mix <br />(6) inch diameter salt glazed vitrified clay pipe main <br />sanitary sewer, complete with the furnishing of all <br />necessary equipment, labor and material for the sum of <br />$ per linear foot. <br />It~.2. The excavation for and the construction of <br />concrete sewer manholes, complete with the furnishing of <br />all necessary equipment, labor and material for the sum <br />of $ each. <br />Item-~e excavation for and th~ construction of <br />concrete sewer flush tank, complete with the furnishing <br />of all ~ecessary equipment, labor and material for the <br />sum of $ complete. . <br />Item No.~e trenching, furnishing and alying of four <br />(4) inch diameter cast iron water main, complete with <br />the furnishing of all necessary gate valves, valve cove~ <br />with Standard Lamp Hole frame and cover and £ittings, <br />~omplete with the furnishing of all necessary equipment, <br />labor and material for the sum of $ per linear foot. <br />Item No. 5. The excavation for, furn-~g and installs <br /> _ <br />tion of Uorey four (4) inch valve opening fire hydrants, <br />complete with the furnishing of all necessary pipe con- <br />nections, gate valves, fittings, valve covers with Stan- <br />dard Lamphole frames and covers, complete with the fur- <br />nishing of all necessary equipment, labor and material <br />for the sum of $ each. <br />Total <br /> <br />E. M. Funk <br /> Pernel Barnett <br />Drainage Construction Co. <br />C. Anill <br />Gogo &,- Rados <br />Daniel Dokovich <br />Franklin B. Gridley <br /> <br />$ 4382.66 <br /> 4543.25 <br /> 4352.50 <br /> 5726.35 <br /> 4188.95 <br /> 4320.29 <br /> 5613.84 <br /> <br /> <br />