Laserfiche WebLink
ARTICLE I. PROJECT <br /> <br /> The project and the estimated expenditure therefor as <br />listed hereinafter constitute the budget heretofore sub- <br />mitted by the city, which bas been, and is hereby, approved <br />by the department: <br /> <br />Project No. E 2 <br /> <br />I Preliminary Engineering _ $5,000.00 <br /> (Surveys, plans, specifications, <br /> estimates of cost) <br /> <br />II Construction Engineering <br /> <br />III Advance Planning <br /> <br />Traffic studies - <br />Planning surveys <br />Estimating cost of correcting <br />deficiencies <br />Materials,Other research and testing <br /> <br />2,500.00 <br /> <br />IV Curb and gutter grade surveys <br /> <br />V Miscellaneous <br /> <br />Total <br /> <br />$7,500.00 <br /> <br />-2- <br /> <br /> <br />