My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 (#755-899)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1922 (#755-899)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:47:22 PM
Creation date
4/14/2003 4:15:49 PM
Metadata
Fields
Template:
Pre-Charter
Year
1922
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference is hereby made to Resolution No. ~81 of the <br /> city of Santa Ana, by the Board of Trustees thereof de- <br /> claring its intention to order said work to be done for <br /> further particulars, which resolution of intention <br /> was passed on the 12th day of December, 1921, and is on <br /> file in the office of the clerk of t~e city of Santa Ana. <br /> <br /> Resolved thst the city of Santa ^ha hereby rejects <br /> <br /> all of said proposals or bids except that hereinafter next <br /> mentioned, and hereby awards the contract for doing <br /> said work and making said improveme~t to the lowest <br /> responsible bidder therefor, to-wit: Pernell Barnett, <br /> at the price named in his bid, as follows: <br /> <br /> Item 1. The excavation of trench, laying of 8 inch ~ <br /> main line sewer and the refilling of trench complete <br /> with the furnishing of all the necessary labor, material, <br /> and equipment, on an estimate of 2488 lineal feet of pipe <br /> for the SLE of eighty-six cents ($0.86) per lineal foot. <br /> <br /> Item 2. The excavation of trench, laying of 8 inch <br /> <br /> line sewer and the refilling of trench complete with the <br /> furnishing of all the necessary labor, material, and equip- <br /> ment on an estimate of 28~0 lineal feet of pipe for the <br /> sum of seventy-five cents ($0.V8) per lineal foot. <br /> <br /> Item 3. The excavation for and the construction of <br /> manholes with the furnishing of all necessary labor, <br /> material, and equipment on an estimate of five (8) man- <br /> holes for the suGn of forty-five dollars ($45.00) each. <br /> <br /> Item 4. The excavation for ~nd the construction of <br /> flush tanks with the furnishing of all necessary labor, <br /> material, and equipment on an estimate of two (2)~flush <br /> tanks for the sum of eighty-five dollars ($88.00) each. <br /> <br /> Item 5. The excavation for and the construction of <br /> <br /> lamp holes with the furnishing of all necessary labor <br /> and equipment on an estimate of two (2) lamp holes for the <br /> sum of ten dollars ($10.00) each. <br /> <br /> The Clerk of the city of Santa Aha is hereby direct- <br /> <br />ed to.post notice of this agard wit~ specifications for <br />five days on or near the council chamber door of the <br />council chamber of the Board of Trustees of the city of <br />Santa Aha, and also publish said notice twice in SANTA <br />ANA DALLY EVENING REGISTER, a daily newspaper published <br />and circulated in the city of Santa Ana, hereby designated <br />for that purpose by the Board of Trustees. <br /> <br /> I hereby certify that the foregoing re~ lution is <br /> <br />a full, true and co~'rect copy of the Re~ lutton of Award <br /> <br />No. 757, duly and regularly introduced and passed by the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.