Laserfiche WebLink
(g) The excavation for and construction of one <br /> reinforced concrete culvert on the westerly side of Bush <br /> Street beneath the railroad track now constructed on and <br /> extending across Bush ~treet, said culvert to be approximately <br /> one foot deep and two feet wide and 1g4.BO feet in length. <br /> <br /> The work and improvement which the Board of Trustees <br />of the city of Sancta Aha intends to order done and m~de on <br />and along West Twentieth Street is briefly described as <br />follows:- <br /> <br /> (a) The regrsding of West Twentieth Street to a sub- <br />grade five inches below the official grade thereof, except <br />on the portion of ~est Twentiet~ Street w?~ere the grade is <br />to be modified and changed, and to a grade five inches below <br />a grade on such portion of ¥iest Twentiet~ Street which sh~ll <br />hereafter become and constitute the true and official grade <br />thereof when the present grade is modified and changed, as <br />in this nesolutton of Intention set forth. <br /> <br /> (b) The construction of an asphaltic concrete pave- <br /> <br /> T ' ~! <br />merit on ~,est weutleth Street ~ inches thick overlaid with <br /> <br />an asphaltic concrete wenring surface l~ inches t~ck, <br />complete to the official grade, except where modified and <br />chnnged, end to the changed and modified grade at the place <br />where the grade is to be modified ~nd c~anged. <br /> <br /> (c) The construction of a concrete curb at the curb <br />lines on and along the'northerly and southerly sides of <br /> <br />West Twentieth Street, except where a concrete curb is already <br />constructed. <br /> <br /> The work and improvement which the Board of Trustees of <br />the city of Santa Aha iotends to order do~e and made on and <br />along East Twentieth Street is briefly described as follows:- <br /> <br /> (a) The regrading of ~sst Twentieth Street to a sub- <br />grade five inches below the official grade thereof. <br /> <br /> (b) The construction of an asphnltic concrete pave- <br />ment on East Twentieth Street ~ inches thick overlaid with <br />an asphaltic concrete wearing surface, l~ inches thick, <br />complete to the official grade. <br /> <br /> (c) The construction of a concrete curb at the curb <br />lines on and along the northerly ~nd southerly sides of ~ast <br />Twentieth Street, and where Shy street, p~rt of a street, <br />or alley intersects or terminates in East Twe~tieth Street, <br />the curb shnll be returned on each side of any such stre~t or <br />alley on a curve back to the ~roperty line on the northerly <br />and southerly sides of East Twentieth Street, excepting <br />where a concrete curb or return curb is already constructed. <br /> <br /> (d) The excavation of o~e main sewer trench along <br /> <br />the center line of East Twentieth Street, commencing at the <br />east line of Bush Street and extending thence e~st 265 feet <br />to the center of a flush tank to be constructed, said sewer <br /> <br /> <br />