Laserfiche WebLink
EXHIBIT 2 <br /> <br /> PRELIMINARY PROJECT STATE~NT <br />ARTERIAL HIGHWAY FINANCING <br /> <br />Arterial Claa~if. CITY OF Santa Aha <br />Primary <br />Name of Street, Seventeenth Street <br />Limits of Improvement, Santiago Avenue to G~and Avenue <br />Length, 0.45 miles <br /> <br />A. EXISTING STREET DATA <br /> <br />Committee Use Only <br /> p..._s, o <br />ADT <br />Funds <br /> <br />No. <br /> <br />1. Right of Way <br />2. Pavement width <br />3. Curb from C/L <br />4. ADT, 13,900 Estimated <br />5. Minimum No. Iraffic Lanes, 2 <br />6. Parking: Diagonal - One Side <br /> Two Sides <br /> <br />Min. 80 ft. 66%: Max. 90 ft. 34% <br />Min. 24 ft. 34%: Max. 54 ft. 25% <br />Min. 28 ft. 18%:' Max. 42 ft. 12% <br /> Counted, x Date, Year 1958 Trucks 5.25% <br /> Width, 11 ft. <br />Parallel - One ~ide None - One Side <br /> Two Sides Two Sides <br /> <br />B. I:IROPOSED SIREET IMPROVEMENT <br /> <br /> 7. MinimumRight of Way 80 ft.: <br /> 8. Minimum Width of Pavement 48 <br /> 9. Curbs from C/L Street, Curbs not included. <br />10. Est. ADT 10 Yrs. 28,000 <br />11. Traffic Lanes 4 Width, 12 ft. <br />12. Parking: None One Side Two Sides <br /> <br />Ultimate R/W <br />Ultimate Width <br />Ultimate Dist. <br />Tr~cks <br /> <br />Part Time <br /> <br />104 £t. <br />84 ft. <br />42 ft. <br /> <br />C. PROJECT DATA <br /> <br />13. Survey and Plans Est. Cost $2,000.00 Work by County <br />~,4. Right of Way Est. Cost $ Non~ Work by ...~ County <br />15. Construction Est. Cost $27,000.00 Work by County <br />16. Inspection Est. Cost $ 500.00 Work by County <br />17. Total Estimated Cost of Project $29,500.00 <br /> <br />x City <br /> ..City <br />x CITY <br />x City <br /> <br />D. ~Ot~C,E OF FUNDS (Explain under Remarks ) <br /> <br /> C~$y CogBty O$heT Total <br />Survey and Plans 1.000 1.000 2.000.00 <br />Riqht of Way 0 0 , <br />Construction 13,500 13.500 27,000.00 <br />Insoection Z~ ~ ~o ~od,~O <br /> TOIA~ $%4.750 $14.750 $29.500.00 <br /> <br />18. Earliest date City will have funds available immediately <br />19. Is this stage construction ]~ Yes - No: No. of yrs. Indefinite (Explain below) <br />20. Remarks: <br /> Seventeenth Street is part of the City's Master Plan of Streets and Highways. <br /> Seventeenth Stret is ultimately to be a 6 lane highway within a 104 foot right of way. <br /> It is proposed at this time to improve Seventeenth Street to 4 lanes, except at rail- <br /> road crossing, where the ultimate right of way will be improved and signals placed to <br /> P.U.C. requirements. /~,' /~/:' ~ll' " <br /> City Official <br /> <br /> Title <br /> <br /> ' <br /> <br />NOTE: Draw Typical Section on Ba~k of Sheet <br /> <br /> <br />