Laserfiche WebLink
PRELIMINATY PROJECT STATFJ~ENT <br />ARTERIAL HIGHWAY FINANCING PROGRAM <br /> <br />Arterial Classif. CITY OF SANTA ANA <br />Primary <br />Name of Street: Seventeenth Street <br />Limits of Improvement: Tustin Avenue to East City Limits <br /> Length ~,113 mi. <br /> <br />Committee Use Only <br />M P,,S 0____ <br />~T <br /> <br />A. EX~$IINO ~TREET DATA <br /> <br />1. Right of Way Min. <br />2. Pavement Width Min. <br />3. Curb from C/L Min. <br />4. ADT 8,000 Estimated x <br />5. Minimum No. Traffic Lanes 2 <br />6. Parking: Diagonal - One Side <br /> Two Sides <br /> <br />50 ft. lO0 %: <br />32 ft. 18 %: <br />24 ft. 40 %: <br /> Counted Date <br /> Width 10 ft. <br /> Parallel - One Side <br /> Two Sides <br /> <br />Max. 50 ft. 100 <br />Max. 66 ft. 52 <br />Max. 42 ft. 19 <br /> Trucks 2 <br /> <br />None - One Side <br /> Two Sides <br /> <br />B. PROPOSED STREET IMPROVEMENT <br /> <br /> 7. Minimum Right of Way 77' (In City) ft.: <br /> 8. Minimum Width of Pavement 67(In City) ft.~ <br />9. Curbs fromCC/L Street 42 ft.: <br />10. Est. ADT 10 Yrs. 16,000 <br />11. Traffic Lanes 6 Width 11 <br />12. Parking: None One Side Two Sides <br /> <br /> Ultimate B/W 104 ft. <br /> Ultimate Width 84 ft. <br /> Ultimate Dist. 42 ft. <br /> Trucks % <br />ft. <br /> Part time <br /> <br />C. PROJF. CT DATA <br /> <br />13. Survey and Plans Est. Cost $ Work by <br />14. Right of Way Est. Cost $15,100.00 Work by <br />15. Construction Est. Cost $15,900.00 Work by <br />16. Inspection Est. Cost $ Work by <br />17. Total Estimated Cost of Project $31~000.00 <br /> <br />x County City <br /> County x City <br />x County City <br />x County City <br /> <br />D. $.gU[ICE OF FUhDS (Explain under Remarks) <br /> <br /> City Cg~nW Other Igtal <br />Survey and Plan~ ~ro Ze~o -. - <br />Riqht of Way , $7,~),00 $7,550 - $15,100.00 <br />Constructio~ .. . 7~950~00 7,~50 <br />Insoectio~ <br /> TOTAL $15.500.00 $15.500.00 ,,, $31.000,0Q <br /> <br />18. Earliest date City will have funds available Immediately <br />19. Is this stage construction x Yes No: No. of yrs. 5 (Explain below)+ <br />20. Remarks: <br /> Construction includes full improvements for a distance of 308' on south side <br /> at rest home, and a maximum of 25~ of pavement on the north. <br /> <br />City Official <br /> <br />Title <br /> <br />NOTE: Draw Typical Section on Back of Sheet <br /> <br /> <br />