Laserfiche WebLink
Arterial Classlf. <br /> <br /> Ma~or <br />Name of Street <br /> <br />PRELIMINARY PROJECT STATF3~NT <br />ARTF-~IAL HIGHWAY FINANCING PRO(~A~ <br /> <br />CITY OF SANTA ANA <br /> <br />Harbor Boulevard <br /> <br />Limits of Improvement North orooertv line 9f VO~t Rubber <br />South orooertv line of Standard Pressed Stegl Length , O~ <br /> <br />EXHIBIT 2 <br /> <br /> s o. <br /> Funds <br /> <br /> No. <br />mi. <br /> <br />A. EXISTING STREET DATA <br /> <br />1. Right of Way Min. 95 ft. 100 <br />2. Pavement Width N~n. 33 ft. 100 <br />3. Curb from C/L Min. None ft. - <br />4. ADT 20,000 Estimated x Counted Date <br />5. Minimum No. Traffic Lanes ..... 3 Width ll '~t. <br />5. Parking: Diagonal - One Side Parallel - One Side <br /> Two Sides Two Sides <br /> <br />Max. 95 ft. 100 <br />Max. ft. <br />Max. ft. <br /> Trucks <br /> <br /> (None) - One Side <br /> Two Sides <br /> <br />B. PROPOSED STRBET IMPROVF~N/ <br /> <br /> 7. Minimum Right of Way <br /> 8. Minimum Width of Pavement <br /> 9. Curbs from C/L Street <br />10. Est. ADT 10 Yrs. <br />11. Traffic Lanes <br />12. Parking: None <br /> <br /> 120 <br /> 100 <br /> 5O <br /> 40,000 <br />6 Width <br />One Side <br /> <br />ft.: Ultimate R/W 120 ft. <br />ft.: Ultimate Width 100 ft. <br />ft.: Ultimate Dist. 50 ft. <br /> Trucks 6 % <br /> 12 ft. <br /> ~wo Sides~ Part Time <br /> <br />C. PROJECT DATA <br /> <br />13. Survey and Plans Est. Cost <br />14. Right of Way Est. Cost <br />15. Construction Est. Cost <br />16. Inspection Est. Cost <br />17. Total Estimated Cost of P~oject <br /> <br />$0,000.00 Work by x County City <br />$~,000.00 Work by County x City <br />19,000.00 Work by x County City <br />Zero Work by x County City <br />19,000.00 <br /> <br />D. ~QU~CE 0F FUNDS (fxplain under Remarks) <br /> <br /> City County Other Total <br />Sm.,~eY and Plans Q Q ... <br />Riqht 9f ~ay O 0 <br />Construc$~On $~,$00.00 $9.500.00 $19.000.00 <br />Insoec$%Q~ . 0 0 <br /> TOTAL $9.500,00 $9.~00,Q0 $19.000.00 <br /> <br />18. Earliest date City will have funds available ...~mediate[y <br />19. Is this stage construction Yes x No: No. of years (Explain below) <br />20. Remarks: <br /> Construction includes 3~503 feet of curb and gutter on the east side, plus <br /> 300 feet of ultimate width pavement and ~urb and gutter on the west side within the <br /> Santa Aha City Limits at Talbert Avenue. <br /> <br />NOTE: Draw Typical Section on Back of Sheet <br /> <br />City Official <br />DATE <br /> <br /> <br />