Laserfiche WebLink
EXIIIBI'i 2 <br />PRELIMINAI$Y PROJECT STATEMENs <br />ARTERIAL HIGI-I,-JAY ^INANCIN^~ PRO;sRAM <br />Arterial Classif. <br />CITY C7~ Santa 6na <br />Name o£ Street Ei rat s+.raet. _ <br />Limits of Improvement S „,~ p„a R; yar <br />_~ Leng~i ~p ,mi. <br />A. E7~:,TINv STREET DF.TA <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />fig- 3 // <br />Committee Use Only <br />M P S O <br />ADT T <br />Fun s <br />FY <br />No. <br />Right of :Jay Min. 60 ft. 7,Op %: Max - ft - % <br />Pavement vJidth Min. ~~t. g3 %: Max~_ft~_% <br />Curb from C/L Min. Noae ft. %: Max ft % <br />ADT 1?_120 Estimated Counted g Date Truc s~o <br />~g5g <br />Minimum No. ra is Lanes ~ <br />2 r/i td~i -y~ _ <br />Parking; Diagonal - Cne Side Parallel - Ciie u~"`i~c e None -One ide <br /> Two Sides (Two ;ides) Two Sides <br />Minimum Right of 'vJay 60 ft.: <br />Minimum ~fJidth of Pavement ft.: <br />Curbs from C/L Street Curbs not included ft. ; <br />Est. ADT 10 Yrs. <br />Traffic Lanes <br />Parking: (None"j- <br />B. PROP :S ~ is STREET IMPRv^VEMENT <br />Two <br />Ultimate R /`~/ 1010_ _ ft. <br />Ultimate vi/idt g ft. <br />Ultimate Dist. 42 ft. <br />Trucks 5 % <br />ft. <br />mart Time <br /> C, PROJECT DATA <br />13. Survey and Plans Est. Cost $ 2,500.00 'iJork by County g City <br />14. Right of clay Est. Cost ~ 27 000.00 ~Jork by County g City <br />15. Construction Est. Cost w 2 , .00 vJork by County g City <br />16. Inspection Est. Cost w 500.00 vvorlc by County g City <br />17. Total3stimated Cost of Project ~ 53"`x.00 <br /> D. SOUP~CE OF FUNDS (Explain under Remarks) <br />13. Earliest date City will have funds available Present vail.able <br />19. Is this stage construction g Yes _No: No. o yrs. xp am e ow <br />20. Remarks: Right of way west of Sullivan St. is being purchased to 52' north of <br />center line in order to facilitate drainage, but no impro ents begond ?1~.' from <br />center line are included i.n this project. ~~ <br />This project will correspond with the ~..~._.__ <br />widening of the bridge by County. City icia <br />Ti e ,~ <br />~~~~ ~~~ ~ <br />NOTE: Draw Typical Section on Back of Sheet. ~-' to <br />-10- <br />