Laserfiche WebLink
ExIIIBI'r 2 <br />PREL ./[INARY PROJECT STATEMET. <br />ARTERIAL HICH<<JAY FINANCING PRO:xRAM <br />Arterial Classif. <br />CITY CF Santa Ana <br />Committee Use Only <br />M P S O <br />ADT <br />Fun s <br />FY <br />No. <br />Primary <br />Name of Street <br />Limits of Improven <br />A. E~STING STREET DATA <br />i. Right of ;Jay Min. ~ ft. qq %: Max 7$ ft_~% <br />2. Pavement vJidth Min.-fit. %: Max ft gq_ % <br />3. Curb from C/L Min. ~ft. ~o: Mart Rq % <br />4. ADT _~Estimated ounted~Da a ruc s o <br />5. Minimum No. ra is Lanes _ ~ ~ _ ~ _ aJi t ~_~ t. <br />6. Parking; Diagonal - Cne Side Parahel - Cne~icTe None -One ide <br />Two Sides (Two Sides Two Sides <br />B. PROl'i^.S D STREET IMPROVEM~.NT <br />7. Minimum Right of i/ay _ 0 ft.: Ultimate R/V/~c ~ft. <br />8. Minimum ~Aidth of Pavemen~~ ft.: Ultimate "vJidt~(,g -ft. <br />9. Curbs from C/L Street 3k ft.: Ultimate Dist. g4 ft. <br />10. Est. ADT 30 Yrs. zg Op0 Trucks 6 % <br />11. Traffic Lanes k e' i t ft. <br />12. Parking: None a „'icTe (Two i es Part Time <br />C. PROJECT DATA <br />13. Survey and Plans Est. Cost $ 5.000.00`JJork by County ~_City <br />14. Right of vlay Est. Cost ~ 3~~000.00 T/ork by County ~_ City <br />15. Construction Est. Cost w~l~pp_p 00"i%Jork by County~_ City <br />16. Inspection Est. Cost w~ 3,p00.00~.~Jork by County ~_City <br />17. Total ,Estimated Cost of Project ,~ 127,000.00 <br />D. SOURCE CF FUNDS (Explain under Remarks) <br />18. Earliest date City will have funds available <br />19. Is this stage construction _Yes _~_No: o. o yr 1$;~ xp ain a orv <br />20. Remarks: The Santiago Creek Bridge Trill be widened to 52- cnrb to curb. <br />Bridge widening c®st = ~65~000.00 <br />Paving Cost = $19000.00 <br />This will complete the pr®gram for widen- <br />ing Main Street ilatil Garden Grove Freewa~p <br />is constructed. <br />NOTE: Draw Typical Section on Back of Sheet. <br />a `'u' <br />/e <br />~~~/_s /~:> 1 <br />ate <br />-10- <br />