My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1926 (#1608-1715)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1926 (#1608-1715)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:11 PM
Creation date
4/16/2003 2:30:47 PM
Metadata
Fields
Template:
Pre-Charter
Year
1926
Pre-Charter - Doc Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
212 <br /> <br /> EFSOLVMD, that the said Board of Trustees hereby rejects <br />ah] of s~id rrooosals or bids exceot tb~t next herein <br />mentioned, end hereby awards the contract for doing s~id <br />work and improvement to the lowest responslb]e bidder, to- <br />T. W. 0glesby, at the price named in his bid, as follows, <br /> <br />to-wit: <br /> <br /> Item <br />on of a <br />complete <br /> <br /> 1. The 2r~d~ng to a subgrade and the laying there- <br /> ~Ive (5) inch Portland Cement Concrete Pavement, <br /> <br /> with the furnishing of a]l necessary equipment, <br />labor and material for th~ sum of fifteen and one-half <br />cents ($0.155) per square foot. <br /> <br /> Item 2. The excavation for and the construction of <br />cement concrete curbs, complete with tbs furnishings of <br />necessary equipment, ~abor and material for t~e sum of <br />forty-four cents (~0.44) per linear foot. <br /> <br /> Item ~. The excavation for ~nd the construction of <br />cement concrete sidewalks havin~ a total t~ickness of <br />three and ~ne-h~lf (~-1/2) inches complete with tbs furnish <br />lng of all necessary equipment, labor and material for the <br />sum of f o~een cents $0.14) per squere foot. <br /> <br /> Item 4. The trenching, fur~sbfng and laying of six <br />inch diameter main sewer, complete with the furnishing of <br />all necessary equipment, labor and material for the sum of <br />sixty-five cents ($0.65) Der linear foot. <br /> <br /> Item 5. The trenching, f~rnlsbing ,nd laying of four <br />(4) inch diameter house connecting sewer laterals complete <br />with tbs furn~shlng of ail necessary equipment, l~bor and <br /> <br />m~terial for t~e sum of forty-four <br />ft. <br /> <br /> Item 6. The exc,vatlon for and <br /> <br />cents ($0.44) per line~: <br />tbs construction of con- <br /> <br />crete sewer manholes, complete with the furn]shlng of all <br />necessary equipment, labor and material for the sum of <br />sixty-five dollars ($65.00) each. <br /> <br /> Item ~. The excavation for and tbs construction of con- <br />crete sewer flush tanks, complete with t~e f~rnishing of <br />all necessary equipment, ]~bor snd material for the sum of <br />one hundre~ dollars ($100.00) each. <br /> <br /> Item 8. The trenching, furnishing and laying of · four <br />inch diameter csst iron pipe w~ter main complete w~th ~]l <br />necessary gets wives, plugs, fittings, concrete v~].ve <br />boxes w~h cast iron frames ~nd covers complete with the <br />furnishing of ail necessary equipment, l~bor and ~aterial <br />for tbs sum of one dollar and fifteen cents ($1.]5) per <br /> <br />linear ft. <br /> <br /> Item §. <br /> <br />stml~ticn <br /> <br />complete with the furnishing <br /> <br />~he excavation for ~nd t?o f~rnishing and in- <br />ce four (4) inch wlve opening fire hydrants <br /> <br /> of a~l necessary equipment, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.