My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927 (#1716-1862)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1927 (#1716-1862)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:21 PM
Creation date
4/16/2003 3:26:55 PM
Metadata
Fields
Template:
Pre-Charter
Year
1927
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
300 <br /> <br />RESOLUTION OF A~%ARD <br /> NO. 1733 <br /> <br /> WHi~REAS, the Board of Trustees of the City of Santa <br />Aha did in open session at a regular meeting theT'eof on the <br />7th day of Karch, 192V publicly open, examine and declare all <br />sealed proposals or bids For doing the following work, unde~ <br />Resolution of Intention No. 1717, in the City of Santa Ann, <br />to-wit: <br /> <br /> RESOLVED: That the said Board of Trustees hereby <br />rejects ail of said proposals or bids except that next herein <br />mentioned, and hereby awards the contract for doing said work <br />and improvement to the lowest responsible bidder, to-wit, <br />OGLESBY, at the price named in his bid as follow~, to-wit: <br /> <br /> Item 1. The grading to a subgrade and the laying <br />thereon of a five (5) luch Portlsn8 Cement Concrete Pavement <br />complete with the furnishing of ail necessary equipment, <br />labor and material for the sum of Seventeen cents (~.17) per <br />square .foot. <br /> <br /> Item 2. The excavation for an~ the construction of <br />Cement Concrete Curbs, complete wit?~ the furnish~ng of all <br />necessary equipment, labor and materf~l for the sum of Fifty <br />cents($.50) per linear foot. <br /> <br /> Item 3. The excavation for and the constructio~: of <br />Cement Concrete Sidewalks, having a total thickness of three <br />and one-hal~ (3-1/2) inches, complete with the furnishing of <br />all necessary equipment, labor srut mat::rtal for the sum of <br />Fifteen celuts (~$.15) per square foot. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.