Laserfiche WebLink
Item 2. The grading to a subgrade and the laying <br />thereon of a five (5) inch asphaltic concrete pavement, complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Seventeen and two-tenths cents ($.17-2/10) per <br />square foot. <br /> <br /> Item 3. The excavation for ahd the construction of <br />cement conc~ete curbs, complete with the furnishing of all <br />necessary equipment, labor and materials, for the sum of Fifty-five <br />cents ($0.58) per linear foot. <br /> <br /> Item 4. The excavation for and the construction of <br />cement concrete sidewalks having a total thickness of three and <br />one-half (3-1/2) inches, complete with the furnishing of all <br />necessary equipment, labor an8 materials, for the stun of Sixteen <br />and'one-half cents ($0.165) per square foot. <br /> <br /> Item 5. The excavation for and the construction of <br />cement concrete sidewalks having a total thickness of five (5) <br />inches, complete with the furnishing of all necessary equipment, <br />labor and materials, for the sum of Twenty cents ($0.20) per square <br />foot. <br /> <br /> Item 6. The trenching, furnish~ng and laying of six <br />(6) inch diameter main sewer, complete with the furnishing of all <br />necessary equipment, labor and material for the sum of Ninety <br />cents ($.90) per linear foot. <br /> <br /> Item 7. The trenching, furnishing and laying of four <br />(~) inch diameter House Connecting Sewers, complete with the furn- <br />ishing of all necessary equipment, labor and material for the sum <br />of Fifty-five cents ($0.55) per linear foot. <br /> <br /> Item 8. The eEcavation for and the construction of <br />Concrete Sewer Manholes, complete with the furnishing of all <br />necessary equipment, labor and material for the sum of Ninety <br />Dollars ($90.00) each. <br /> <br /> Item 9. The excavation for an~ the construction of <br /> Concrete Sewer Flushtank, complete with the furnishing of all <br /> necessary equipment, labor s nd materi~l for the sum of One Hundred <br /> Twenty Dollars ($120.00) each. <br /> <br /> Item 10. The excavation for ahd the constr~ction of one. <br /> reinforced concrete culvert, complete with the furuishing of all <br /> necessary equipment, labor and material for the sum of Four <br /> Hundred Fifty Dollars ($4~0.00) complete. <br /> <br /> The Clerk of the City of Santa Ana is hereby directed <br /> to post a notice of this award conspicuously for five (8) days <br /> on or near the door of the Council Chamber of the Board of <br /> Trustees of the City of Santa Ana, and also publish ~aid notice <br /> twice in the Santa Ana Daily Evening Register, a daily newspa~e~ <br /> <br /> <br />