Laserfiche WebLink
Item No. 3. The excavation for and the construction of Portland <br /> cement concrete sidewalks having a total thickness of three and one-half (3-1/2) <br /> inches, complete with the furnishing of all necessary equipment, labor and materis <br /> for the sum of Fifteen cents (SO.l§) per square foot. <br /> <br /> Item No. 4. The excavation for and the construction of Portland cement <br /> concrete sidewalks having a total thickness of five (§) inches, complete with the <br /> furnishing of all necessary equipment, labor and material for t~e sum of Eighteen <br /> cents ($0.18) per square foot. <br /> <br /> Item No. 5. The trenching, furnishing and laying of six (6) inch <br /> diameter vitrified clay pipe main sewer, complete with the furnishing of all <br /> necessary equipment, labor and material for the sum of Seventy cents $0.70) per <br /> linear' foot. <br /> <br /> Item No. 8. The trenching, furnishing and laying of foul' (4 inch <br /> diameSer vitrified clay pipe house connecting sewers, complete with the furnishing <br /> of all necessary equipment, labor and material for~the sum of Fifty cents ($0.80) <br /> per linear foot. <br /> <br /> Item No. V. The excavation for and the construction of Standard Concrete <br /> Manhole complete with the furnishing of all necessary equipment, labor and <br /> material for the sum of Seventy Dollars ($70.00) complete. <br /> <br /> Item No. 8. The excavation for and the construction of a standard <br /> concrete flushtank together with all necessary appurtenances thereto, complete <br /> with the furnishing of all necessary equipment, labor and material for the sum of <br /> One Hundred Twenty Dollars ($120.00) complete. <br /> <br /> Item No. 9. The trenching, furnishing and laying of fou~ (4) inch <br /> diameter cast iron pipe water main, together with all necessary valves, concrete <br /> valve boxes, fittings and other necessary appurtenances thereto, e~nplete with <br /> the furnishing of all necessary equipment, labor and material for the sum of <br /> One Dollars ($1.00) per linear foot. <br /> <br /> ~.~Item No. 10. The trenching, furnishing and laying of three-quarter (3/4) <br /> inch dia~ete~ ~opper pipe house connecting water services, together with all <br /> corpor&~le~ S.~ka, curb cocks, fittings and necessary appurtenances thereto, <br /> complete w~t~,~the furnishing of all necessary · quipment, labor a~material for the <br /> sum of Eighteen Dollars ($18.00) each. <br /> <br /> Item Ne. 11. The excavation for, the furnishing and the installation of Cor~ <br />renu- (4~,!~ch valve opening fire hydrants together with the valves, valve boxes, <br />pi~e and other necessary appurtenances thereto, c~mplete with the furnishing of all <br />necessary equipment, labor and material for the sum of Ninety-five dollars <br />each. <br /> <br /> Item No. 12. The trenching, furnishing and laying of three (3) inch diamete~ <br />Byers Wrought iron pipe gas main complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Seventy cents ($0.70) pe~ linear foot. <br /> <br /> Item No. 13. The trenching, furnishing and laying~of three'quarter (3/4) <br />inch diameter Byers wrought iron pipe house connecting gas services, together with <br />all cocks, fittings and necessary appurtenances thereto, complete with the <br />furnishing of all necessary equipment, labor and material for the sum of Twelve <br />Dollar~ ~$12.00) each. <br /> <br /> Item Nc. 14. The ~emoval and disposal of all existing trees or stumps <br /> <br /> <br />