My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1931 (#2272-2325)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1931 (#2272-2325)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:46 PM
Creation date
4/17/2003 11:11:42 AM
Metadata
Fields
Template:
Pre-Charter
Year
1931
Pre-Charter - Doc Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTIOi~ OF ..~ W,ARD' <br /> <br />NO. 2282 <br /> <br /> ;'Y_[EREAS, the City Council of the City of Santa Aha did, in open session, <br />at a regular meeting thereof, on the 19th day of January, 1931, publicly open, <br />examine and declare all sealed proposals or bids for doing the following work, <br />under Resolution of Intention Nee S~68, in the City of Santa .kna~ to-wit: <br /> <br /> exist,: a!l,as~:pm'ttcutarl~ ladi~te~ on <br /> <br /> cu~ avon ~ along the her~b~. <br /> <br /> now on file In <br /> <br /> RESOLVE~: That the said City Council hereby rejects all of said proposal <br />or bids except the next herein mentioned, and hereby awards the contract for doing <br />said work and improvement to the lowest responsible bidder, to-wit: John it. Davie~ <br />at the prices named in his bid as follows, to-wit: <br /> <br /> Item No. 1. The furnishing and installing upon and along the -portion of <br />the Street upon and along the portion, of the street upon which work is specified <br />to be done under the specifications and plans for Assessment District No. 189 of al <br /> <br />necessary conduit, cables, ground connections and the making of the necessary <br />connections to the existing circuit and the repair and replacement of all pavement, <br />sidewalk, curb or conduits cut or damaged during construction, complete with the <br />furnishing of all labor, equipment and material for the s~n of One Hundred Eighty- <br />five and no/100 Dollars (;j~185.00) complete. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.