Laserfiche WebLink
RESOLUTION NO. 2423 <br /> <br />RESOLUTION ACCEPTING PROPOSAL FOR CERTAIN CHANGES <br />IN PROPOSED PLANS AND SPECIFICATIONS FOR CITY HALL, <br />SUBJECT TO APPROVAL OF PUBLIC WORKS ADMINISTRATION. <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA: <br /> <br />That certain changes in the plans and specifications for the construction of <br /> <br />thc City Hall now being erected be accepted and approved and that the offer of Dali & <br /> <br />Honer, General Contractors, for the construction of said City Hall, to make said change <br /> <br />at certain additions and deductions in price, be accepted and approved as follows, <br /> <br />to-wit: <br /> <br />The items constituting the change order are listed in detail with tho add- <br /> <br />itional cost amounts or credits appearing opposite each item. <br /> <br />ITEMS ADDITIONS DEDUCTIONS <br /> <br />For the installation of additional <br />toilet facilities for the ladies. <br />All to be according to the drawings <br />as shown on sheet of drawings entitled <br />"CHANGE ORDER ~l". <br /> <br />$ 996.00 $ <br /> <br />For the rearrangement of the City <br />Clerk's and City Water Department, <br />all as shown by drawing on sheet of <br />drawings entitled "CHANGE ORDER #1". <br /> <br />45.0o <br /> <br />For the installation of additional <br />conduit to take the municipal fire <br />alarm wire from the northeast corner <br />of the building to the Desk Sergeant's <br />desk in the Police Department, <br />conduit to be 3/4" <br /> <br />38.66 <br /> <br />40 <br /> <br />For the moving the termination of <br />the P.B.X. conduit from the location <br />on the original drawings to a <br />location as shown on the sheet of <br />drawings entitled "CHANGE ORDER #l". <br /> <br />34°00 <br /> <br />For pe~nission to use regular run <br />washed rock and gravel for the <br />concrete aggregates, instead of the <br />crushed rock as specified. The <br />aggregated to be composed of a mix <br />as prescribed by the Testing <br />Laboratory in their PRESCRIBED MIX <br />FOR CONCRETE AGGREGATES as pertaining <br />to the Santa Ana City Hall Building. <br /> <br />360.00 <br /> <br />65 <br /> <br />For the construction of a <br />connecting bridge to be built <br />across the light court, all <br />according to drawing shown on <br />sheet of drawings entitled <br />"CHANGE ORDER #l". <br /> <br />$1~85.00 <br /> <br />For the construction of that <br />portion of the building that was <br />taken out of the general contract <br />figure by the acceptance of <br />Alternate No. 3. All of the work <br />and materials to be according to <br />the Original Plans and Specifications, <br />excepting changes as shown on sheet <br />of drawings entitled "CHANGE ORDER <br />No. l". All corridor walls and <br />ceilings to be plastered and finished <br />complete. <br /> <br />$5378.00 <br /> <br />For installation of a passenger <br />elevator, all according to <br />approved Original Plans and <br />Specifications. <br /> <br />$4485.00 <br /> <br />V A. <br /> For completely finishing Room <br /> Areas 304, 305, 306 and 307, all <br /> according to Original approved <br /> Plans and Specifications. (This <br /> portion w~s left unfinished by the <br /> Borrower accepting Alternate Bid <br /> No. 13) <br /> <br />~ 854.00 <br /> <br /> <br />