Laserfiche WebLink
~ESODUTION NO. 2442 <br /> <br />RESOLUTION ACCEPTIN8 PROPOSAL FOR CERTAIN CHANGES <br />IN PROPOSED PLANS AND SPECIFICATIONS FG~ CITY HALL, <br />SUBJECT TO APPROVAL OF PUBLIC WORKS ADMINISTRATION. <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA: <br /> <br />That certain 6hanges, known as Change Order No. 8, in the plans and <br /> <br />specifications for the construction of the City Hall now being erected, be accepted and <br />approved and that the offer of Ball & Honer, General Contractors, for the construction <br />of said City Hall, to make said changes at certain additions and deductions in price, <br /> <br />be accepted and approved as follows, to-wit: <br /> <br />The items constitutiD~ the change order are listed and itemized as here- <br /> <br />inafter set for~, and the details with the additioD=l cost amounts or credits allowable <br /> <br />to each item a~e as more particularly set forth in the records of the architect for the <br /> <br />construction of said building, and as hereinafter itemized, to-wit: <br /> <br />All the miscellaneous changes as of November 4, 1935. <br /> <br />ADDITIONS <br /> <br />Room ~15, utility door & frame $' 25.00 <br />Room ~33, " " " " 32.00 <br />Door & frame.over vault~ ~9, 2-6x6-0 34.00 <br />Room ~ll, furring walls 29.00 <br />Room ~217, " # 15.00 <br />" ~219, " south v~l 15.00 <br />" ~212-213, furring south wall & ceilings 53.50 <br />S. wall of light court, 3rd floor 25.00 <br />Partition, 3rd floor fc~ hose cabinet 38.50 <br />Beams for ~203 to c~ve~ pipes, et?. 22.00 <br />Wall between Col. 5 12 2 (Council) 33.50 <br />~ 3rd floor toilet ~oom, ~311 ~ 36.00 <br />East & sou~h walls of Court room 32.50 <br />Furring, 2nd floor water heater 34.00 <br /> " 3rd " " " <br />Partition building Inspector Dept'. 127.00 <br />Changing partition, Police Dep!~. 50.00 <br /> " " Auditor!s ~ep't. 26.00 <br />2 transoms in Room ~2& 41.50 <br />Reinforcing steel beam, 52 & 53 80.96 <br />Labor placing same 35.00 <br />Changing steel in spandrel,"3rd floor 18.00 <br />Labor installing 52 elec. cans (incl. reinforc'g.) 208.00 <br />Sump in basement 179.00 <br />Misc. electric wiring 102.62 <br />Plateglass in Council Chamber 35.00 <br />Partition to men's toilet 98.00 <br />Plumbing 329.65 <br />Marble 50.69 <br />Electric beacon 125.00 <br />Gas li~e i~ Bldg. Iuapector's office 13.97 <br />C~a~nge in Cte~k's office 1380.47 <br />Doors on 3rd floor 67.94 <br />Fruiting ceiling, room $£19 19.00 <br />Floor finish 220.00 <br />Furring, plaster caps, cornices in Council Room 69.50 <br />Windows, wood to steel 890.50 <br />Glazing on 3rd floor 72.73 <br />Electric wiring for elec. beacon 27.55 <br />Bronze plaques 250.00 <br />Accoustic ceiling, water & clerk's depts. 275.00 <br />~% increase in sales tax $10.00 <br />Electric wiring & switchboard 1977.00 <br />Electric heaters over gas radiation 738.00 <br />Decorating Council Chamber & entrance Foyer 475.00 <br /> <br />That the contractc~ be and he is hereby granted an extension of time <br /> <br />amounting to Thirty (30) days from and after the present date set for the completion of <br /> <br />the contract, within which to complete said contract. <br /> <br /> BE IT F~RTHER RESOLVED That the acceptance and approval of the foregoing <br />chaD~es is subject to the approval of the Public Works Administration of the United <br /> <br />States of America. <br /> <br /> <br />