Laserfiche WebLink
RESOLUTION NO. 2452 <br /> <br />RESOLUTIONACCEPTING PROPOSAL FOR CERTAIN CHANGES <br />IN PROPOSED PLANS AND SPECIFICATIONS FOR CITY H~., <br />SUBJECT TO APPROVAL OF PUBLIC WORKS ADMINISTRATION. <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA: <br /> <br />That certain ch~mges, knovm as Change Order No. ?, in the plans and spec- <br /> <br />ifications for the construction ef the City Hall now being erected, be accepted and <br /> <br />approved and that the offer of Ball & Honer, General Contractors, for the construction <br /> <br />of said City Hall, to make said changes at certain additions and deductions in price, <br /> <br />be accepted and approved as follows, to-wit: <br /> <br />The items constituting the change order are listed and itemized as herelnafte~ <br /> <br />set forth, and the details with the additional cost amounts or credits allowable to each <br /> <br />item are as more particularly set forth in the records of the architect for the con- <br /> <br />struction of said building, as follows: <br /> <br />ITEMS ADDITIONS DEDUC~I,ONS <br /> <br />1. Credit for decorating Council <br /> Chamber and entr,nme lobby <br /> included in Chan~e 0~der ~6 <br /> <br />$ 475.00 <br /> <br />Decorating ornamental plaster capitals <br />and panels in Water and Auditor~s <br />Depmt., Court Room and Council Chamber <br />walls and ceiling <br /> <br />$ 495.00 <br /> <br />Plastering rough concrete walls, <br />beams and ceiling of auto driveway <br />to basement (not included in contract), <br />and alley wall of building to Mezzanine. <br />floor window sills <br /> <br />110.00 <br /> <br />Credit for omission of Acoustic ceiling <br />in Water and City Cler~3B Departments, <br />omitted due to inpracti~ability of <br />installation <br /> <br />275.00 <br /> <br />Clear glass in Police & Auditor's <br />Departments removed and pyramid glass <br />installed to obscure vision on street <br /> <br />25.00 <br /> <br />$tu~nging all gas outlets throughout <br />building, capping pipe, plaster patching <br />and painting same. <br /> <br />40.00 <br /> <br />Waterproofing Mezzanine and third floor <br />toilet room floors of wood construction, <br />not included in original specifications. <br /> <br />30.00 <br /> <br />® <br /> <br />Cutting reinforcing on 2nd floor beams <br />and girders due to improper detailing <br />of reinforcing <br /> <br />25.00 <br /> <br />Changing sink and cabinet work in <br />mezzanine Police Dept. photographic <br />developing room due to larger size <br />requirement of department and painting <br /> walls and ceiling and woodwork black <br /> <br />50.00 <br /> <br />10. <br /> <br />Building raised platform and fitting <br />P.B.X. board at Information Counter and <br />additional mahogany paneling, mouldings, <br />labor and painting <br /> <br />65.00 <br /> <br />ll. <br /> <br />Installing larger size and revised design~ <br />of electric fixtures in Council Chamber, <br />Water Department, City Clerk's Department <br />and Main Corridor in lieu of those <br />specified <br /> <br />218.00 <br /> <br />12. <br /> <br />Additional 2 feet added to length of <br />· uw~D columns due to change of roof <br />levels created by ch~%uge in location <br />of Council room, not shov~ in Change <br />Order No. 4 <br /> <br />50.00 <br /> <br />13. <br /> <br />Steel sash installation, added work by <br />fitting against steel instead of wood as <br />per original contract <br /> <br />45.00 <br /> <br /> <br />