Laserfiche WebLink
.center ±ine, the flow line of the gutter at the curb upon and along the gutter line, the <br />top of the curb upon and along the curb line, and the to,~ of the sidewalk upon and along <br />the property line of said Spurgeon Street~ respectively. <br /> <br /> The elevation at the point of intersection of the center line of Spurgeon <br /> Street with the center line of East Sixth Street is 1~8.~0 feet. <br /> <br /> The elevation at the point of intersection of the c~nter li~e of Spurgeon <br /> Street with the center line of ~ast Seventh Street is 130.75 feet. <br /> <br /> The elevation at the point of intersection of the Westerly gutter line of <br /> Spurgeon Etreet with the No~therly line of East Sixth Street ~s 12V.69 feet. <br /> <br /> The elevation at the point of intersection of the ~esterly gutter line of <br /> Spurgeon Street with the Sgutherly line of East Seventh Street is 129.50 feet. <br /> <br /> The elevation of the top of the curb at the point of intersection of the <br />Westerly curb line of Spurgeon Street with the Northerly line of East Sixth Street is <br />128.38 feet. <br /> <br /> The elevation of the top of the curb at the point 5f ~ntersection of the <br />Westerly curb line of Spurgeon Street with the Southerly line of East Seventh Street is <br />130.32 feet, <br /> <br /> The elevation of the top of the sidewalk at the point of intersection of the <br />~'esterly line of Spurgeon Street with the Northerly line of East Sixth Street is 128.60 <br />feet. <br /> <br /> The elevation of the top of the sidewalk at the point of intersection of the <br />Westerly line of Spurgeon Street' with the Southerly line of East Seventh Street is <br />130o60 feet. <br /> <br /> The official width of Spurgeon Street is sixth (60) feet from property line <br />to property line and being thirty (30) feet on each side of the center line thereof. <br /> <br /> The c~ficial width of the pavement on Spurgeon Street is fqrty (40) feet and <br />being twenty (20) feet on each side of the center line thereof. <br /> <br /> The official width of the sidewalk and park~.~ay re~ervation on Spurgeon Street <br />is ten (10) feet and being im~lediately adjacent to the property lines thereof. <br /> <br /> Section No. 3. The official grade of and upon East Sixth Street between the <br />points hereinafter mentioned is hereby fixed and established as follows: <br /> <br /> The grad~ is stated at designated points upon and along the center line, the <br />gutter line, the curb line, and the property line of East Sixth Street and the <br />elevations give~ are for the top of the crown of the street upon and along the center <br />line, the flow line of the gutter at the curb upon and along the gutter line, the top <br />of the curb upon and along the curb line, and the top of the sidewalk upon and along the <br />property line of said East Sixth Street, respectively. <br /> <br /> The elevation at the point of intersection of the center line of Eazt Sixth <br />Street with the center line of Bush Street is 1~7.50 feet. <br /> <br /> The elevation at the point off intersection of the center line of East Sixth <br />Street with the center line of Spurgeon Street is 128.20 feet. <br /> <br /> The elevation at <br /> <br />East Sixth Street with the <br />The elevation at <br /> <br />East Sixth Street with the <br />The elevation at <br /> <br />the point of intersection of the Northerly gutter line of <br />Easterly line of Bush Street is 12~.91 feet. <br />the point of intersection of the Northerly gutter line of <br />Westerly line of Spurgeon Street is 127.50 feet. <br />the top of the curb at the point of intersection of the <br /> <br /> <br />