Laserfiche WebLink
EXHIBIT 2 <br /> <br />PRELIMINARY PROJECT STATk~ENT <br />ARTERIAL HIGHWAY FINANCING PROGRAM <br /> <br />Arterial Classif. <br /> Primary <br /> <br />Name of Street <br />Limits of Improvement <br /> <br />Edinger Avenue <br /> <br />CITY 0F Santa Ann <br /> <br />Maple Street to Bristol Street <br /> <br />Length 1.25 mi. <br /> <br />Cormmittee Use 0nly <br />M P S 0 <br /> <br />ADT <br />Funds <br />FY <br /> <br />No. <br /> <br />A. EXISTING STREET DATA <br /> <br />1. Right of Way Min. 50 ft. 15 %: <br />2. Pavement Width Min. 33 ft. 20 %: <br />3. Curb from C/L Min. 1-~.5 ft. 20 %: <br />4. ADT 1©~987 Estimated Counted X <br />5. Minimum No. Traffic Lanes 2 Width 10 ft. <br />6. Parking: Diagonal - One Side Parallel - One Side <br /> Two Sides Two Sides <br /> <br />Max 60 ft 85 <br />Max O-~ft <br />Max 20 ft <br /> Date 10/1/6~--Trucks <br /> <br />None- One Side <br /> Two Sides <br /> <br />B. PROPOSED STREET IMPROVEMENT <br /> <br />7- Minimum Right of Way 98 - 110 ft.: <br />8. Minimum Width of Pavement 28 ft.: <br />9. Curbs from C/L Street 33 to 41 ft.: <br />10. Est. ADT l0 ~ears 18~500 <br />ll. Traffic Lanes 4 Width <br />12. Parking: None One Side Two Sides <br /> <br />Ultimate R/W 98 -llO ft. <br />Ultimate Width 54 - 68 ft. <br />Ultimate Dist. 33 ~o 41 ft. <br />Trucks 6 % <br /> ft. <br /> Part Time <br /> <br />Proposed frontage road on south side - See Typical Sections <br /> <br />C' PROJECT DATA <br /> <br />13. Survey and Plans Est. Cost $ 34,500. Work by <br />14. Right of Way Est. Cost $ Work by <br />15. Cor~truction Est. Cost $ 362~250. Work by <br />16. Inspection Est. Cost $ 17~250. Work by <br />17. Total Estimated Cost of Project $ ~14~000. * <br /> <br />County X City <br />C6unty City <br />County X City <br />County X City <br /> <br />D. SOURCE OF FUNDS (Explain under Remarks) <br /> <br />Survey and Plans <br /> <br />Right of Way <br /> <br />City County <br />$ 17~5o. $ 17~2~o. <br /> <br />Other Total <br /> <br />Construction 181~125. <br />£nspection 8~625. <br /> <br />181~125. <br /> <br />TOTAL $207~000. <br /> <br />18. Earliest ~ate City will have funds available <br /> <br />8~625. <br /> <br />$207~000. <br /> Ju~ ~ <br /> <br />$414~000. <br /> <br />19. Is this stage construction X Yes ~No: No. of yrs. <br />20. Remarks: Construction to be done in Fiscal Year 1963-64. <br />* This amount does not include cost of right of way which <br />is being acquired under other AHFP projects. <br /> <br />NOTE: Draw Typical Section on Back of Sheet. <br /> <br /> (Explain below) <br /> ,,, <br /> City Official <br />Director of Public Works <br /> <br />Title <br /> <br /> <br />