My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Amend CIP for First Street Slope Stabilization Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item 17 - Amend CIP for First Street Slope Stabilization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:19:49 PM
Creation date
7/10/2024 10:30:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. To compensate the contractor for costs associated with chipping the bottom of the anchor wall <br />to facilitate the new, widened sidewalk (PCQ No. 19). <br />TOTAL. COST = $31,773.17 <br />Delete Bid Item Quantities <br />Bid Item #12: Remove unused bid item quantities for Bid Item #12. Two Hundred linear Feet <br />was not used in the project @ $250.00 per linear Feet. <br />TOTAL. CREDIT AMOUNT= ($50,000A0) <br />TOTAL AGREED CHANGE ORDER COST: $585,619.53 <br />TOTAL AGREED CONTRACT INCRf Asl* COST: $636,519.53 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.