My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract to Painting and Wrought Iron Restoration at Santa Ana Regional Transportation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item 21 - Construction Contract to Painting and Wrought Iron Restoration at Santa Ana Regional Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:20:40 PM
Creation date
7/10/2024 10:35:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />SARTC Painting and Wrought Iron <br />Restoration <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Facility <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Repair the exterior painting and wrought iron fencing throughout the <br />Santa Ana Regional Transportation Center. This entails the <br />restoration of existing wrought iron fencing to match the existing <br />design of the facility. Additionally, the project will include ornamental <br />wrought iron fencing replacement around the building, as well as the <br />refurbishment of the iconic Santa Ana signage in the courtyard. <br />PROJECT NEED: <br />The Santa Ana Regional Transportation Center is a high -use public <br />transportation hub that has deteriorated over the years. This facility <br />requires attention to exterior of the facility. These enhancements will <br />provide the patrons with a safe, clean and architecturally sound <br />environment to enjoy. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 1,500,000 - - - - - - <br />TOTAL 1,500,000 - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />PWA - SARTC OPERATIONS 1,500,000 - - - - - - <br />TOTAL 1,500,000 - - - <br />DIVISION: <br />Parks, Fleet & Facilities <br />CONTACT: <br />Mike Ortiz, Senior Civil Engineer <br />DATE: <br />27-Jun-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.