My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Construction Contract for Council Chambers Restroom and Translation Booth Remodel
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item 14 - Construction Contract for Council Chambers Restroom and Translation Booth Remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:19:36 PM
Creation date
7/10/2024 10:36:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-0504 <br />COUNCIL CHAMBERS RESTROOM & TRANSLATION ROOM <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM. LC) W <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />mobilization <br />1 <br />LS <br />$ vn <br />$ 4-� <br />2 <br />demolition <br />1 <br />LS <br />$ ff �, e� <br />Ila 0 <br />3 <br />concrete slab, concrete stair <br />1 <br />LS <br />$ <br />4 <br />metal stud framing, post & <br />1 <br />LS <br />$ c e <br />Z <br />$� <br />miscellaneous framing, new <br />hand railing at ramp and stairs <br />5 <br />new hollow metal and steel doors <br />frames door hardware <br />1 <br />LS <br />$ <br />$ <br />and with <br />6 <br />new gyp board, patching, new <br />1 <br />LS <br />$ <br />painting and caulking <br />7 <br />the work, complete with grout <br />1 <br />LS <br />$ <br />$ <br />` <br />and sealing <br />8 <br />carpet tile, padding, adhesive, <br />1 <br />LS <br />$ 70 a <br />$r <br />and required accessories for <br />' <br />complete work <br />9 <br />rubber base and adhesives <br />1 <br />LS <br />$ <br />10 <br />luxury vinyl tile, padding, and <br />1 <br />LS <br />$� �70 „ca <br />$! Y' <br />required accessories for complete <br />work <br />11 <br />all restroom accessories, and <br />1 <br />LS <br />$ fd'() <br />$ <br />signage, <br />12 <br />duct work, mechanical system, <br />1 <br />LS <br />$ d - e <br />$ / q2 4�6a <br />and exhaust fans <br />13 <br />all plumbing fixtures and required <br />1 <br />LS <br />$ �i0 �o <br />$�/ A <br />back supports, venting pipes, <br />supply pipes, and accessories <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.