My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item HA-03 - Amended and Restated Regulatory Agreement for the Rehabilitation of Garden Court
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item HA-03 - Amended and Restated Regulatory Agreement for the Rehabilitation of Garden Court
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:24:24 PM
Creation date
7/10/2024 4:57:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
HA-03
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. PROJECT DESCRIPTION <br />A. REGIONAL LOCATION <br />The Project is located in the City of Santa Ana within Orange County. The Project site is <br />immediately accessible from Interstate 5 and State Highways 22 and 55 (Figure 1: Regional <br />Project Location). Surrounding communities include Orange, Tustin, Irvine, Fountain Valley and <br />Garden Grove. <br />s 1 ElmonteAWest Covina On rio <br />Los Angeles,, _ 57 Pomona <br />�rl `�M Ontebeil+o <br />Huntington <br />Park �,Ezo <br />Whittier <br />ewood wn`ey �I <br />Compton orwalkz,,,— <br />Beach <br />Terminal <br />des Island <br />Chino <br />C <br />Chino Hills C <br />State Park <br />YorbazLinda <br />Fullerton ', <br />4naheirrr ti <br />\ b <br />Fountain <br />Valley10 <br />7hhr- <br />5�HuntingtonlrUine <br />Beach <br />Nebeac <br />73r1 <br />li$o <br />Figure 1: Regional Project Location <br />B. PROJECT SITE LOCATION AND DESCRIPTION <br />akTra Eau co <br />241 �-_Canyon <br />Lake Forest `�!, <br />on Viejo <br />The Project site is located at 300 E. Santa Ana Boulevard, Santa Ana, CA 92701 and its general <br />boundaries include E. Santa Ana Boulevard, N. Spurgeon Street, E. 5th Street and French Street. <br />The site spans 1.44 acres and one parcel improved with one building with 84 units. As of the date <br />of this Plan, 80 units are occupied by tenants, one unit is occupied by an on -site manager, and three <br />units are vacant (Figure 2: Project Site and Figure 3: Project site with addresses). <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.