Laserfiche WebLink
RESOLUTZON N0.65-1~4 REQUESTING <br />ALLOCATION OF FUNDS FOR THE FIRST <br />STREET UNDERPASS UNDER SECTION 190 <br />OF THE CALIFOI~I~IA STREETS A1VD HIGHWAYB <br />CODE <br /> <br /> WHEREAS~ Section 189 of the Streets and Highways Code of the <br />State of California, provides that the Public Utilities Commission shall <br />prepare a priority list of railroad and street grade crossings most in <br />need of separation~ and <br /> <br /> WHEREAS, Crossing Nos. 2~175.6-B and BK-51T.17-B on First <br />Street between Evergreen Street and Grand Avenue in the City of Santa Aha <br />was rated priority number i in the State of California for the calendar <br />year 196~, and <br /> <br /> WHEREAS~ Section 190 of the same Code provides that the sum of <br />$5,000,000 shall be allocated each year to be used for the elimination of <br />grade crossings by the construction of grade separations. <br /> <br /> NOW, THEREFORE, LET IT BE RESOLVED, that the City Council of <br />the City of Santa Ana hereby makes application to the California Highway <br />Commission for an allocation of $612~800, which is 50% of the total <br />estimated cost of the First Street Grade Separation Project after de- <br />ducting all railway contributions. <br /> <br /> 1. All requirements of Section 190 of said Code have been met <br /> and it is possible to award a construction contract within <br /> six months from this date. <br /> <br /> 2. a. The estimatedtotal cost of the project is as follows: <br /> <br /> Preliminary engineering~ surveys and plans $ 44~45 <br /> <br />Right of Way Acquisition <br /> <br />Construction <br /> <br />Work by Railroads <br /> <br />Construction Engineering <br /> <br /> 545,000 <br /> 581,360 <br /> 181~725 <br /> 22~170 <br />TOTAL $1,374,600 <br /> <br />The estimated break-down between the various agencies <br /> <br />is as follows: <br /> <br /> <br />