My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TKE ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
T
>
TKE ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 9:25:18 AM
Creation date
7/25/2024 9:24:41 AM
Metadata
Fields
Template:
Contracts
Company Name
TKE ENGINEERING, INC.
Contract #
A-2024-099-02
Agency
Public Works
Council Approval Date
7/16/2024
Expiration Date
6/30/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 119 <br />SCHEDULE <br />Below is an example of our schedule of deliverables for on -call engineering plan check projects. <br />Plan Check Type <br />—Conditions -Of-Approval <br />SubsequentFirst Submittal . <br />(14 Calendar Days)Calendar Days) <br />8 2 <br />Traffic Impact Analysis (TIA) <br />6 <br />3 <br />Parcel/Tract Map <br />20 <br />8 <br />Water Quality Management Plan <br />8 <br />4 <br />Hydrology/ Hydraulics Report <br />12 <br />4 <br />Geotechnical Report <br />4 <br />1 <br />Rough Grading Plans <br />8 <br />4 <br />Street Plans <br />16 <br />8 <br />Precise Grading Plan <br />16 <br />8 <br />Storm Drain Plans <br />16 <br />8 <br />Water Plans <br />12 <br />4 <br />Sewer Plans <br />12 <br />4 <br />Street Light Plans <br />4 <br />2 <br />Signing And Striping Plans <br />8 <br />4 <br />Landscape Plans <br />8 <br />4 <br />Traffic Signal Plans <br />4 <br />2 <br />Retaining Wall Plans <br />4 <br />2 <br />SWPPP <br />8 <br />4 <br />Request for Proposals for On -Call Engineering Plan Check Services <br />Ift City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.