My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CANNON CORPORATION
Clerk
>
Contracts / Agreements
>
C
>
CANNON CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:01:49 PM
Creation date
7/25/2024 10:43:32 AM
Metadata
Fields
Template:
Contracts
Company Name
CANNON CORPORATION
Contract #
A-2024-099-05
Agency
Public Works
Council Approval Date
7/16/2024
Expiration Date
6/30/2027
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cannon provided on -call civil engineering plan <br />check and map check services on more than 100+ <br />development projects for the City of Lancaster. As <br />part of our on -call contract with the City, Cannon <br />reviewed grading and drainage plans, erosion control <br />plans, hydrology and hydraulic reports, storm drain <br />improvement plans, street improvement plans, water <br />improvement plans, sewer area studies, sewer <br />improvement plans, landscaping and irrigation plans <br />within a landscape maintenance district (LIVID), street <br />light improvement plans and voltage drop calculations, <br />soil/geotechnical reports, bond estimates, final <br />mapping, and other documents. <br />Cannon's Plan Check Team reviewed the conditions <br />of approval, reference material, City standard plans, <br />plan checklist requirements and accessibility for <br />projects constructed in the City for conformance with <br />City Codes and ordinances, including the County <br />Grading Code and Manual, "Greenbook" Standard <br />Specifications for Public Works Construction, County <br />Standards and Design Manual, California Building <br />Codes, Los Angeles County Hydrology Manual and <br />Los Angeles County Flood Control Hydraulic Design <br />Manual. Extensive coordination was required between <br />the different City departments and engineer of record <br />to confirm quick turnaround times. <br />Cannon provided reviews in Bluebeam Revu and <br />transmitted plan check submittals using the City's <br />Accela website. <br />Cannon provided broad -based plan checking duties <br />for the City of El Monte. Plan check services include <br />grading, soils report reviews, storm drain, hydrology <br />reports, LID reports, street improvement plans, parcel/ <br />tract maps, condominium plans, easements, and lot <br />line adjustments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.