My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:44:48 AM
Creation date
7/31/2024 12:21:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-050 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />8. Control Logic <br />V. VALVES TRAINING SERVICES <br />Upon request, the Contractor shall provide in depth training on flow control valve operation, <br />maintenance, and repair techniques that optimize staff management of the system. Classes shall <br />include training materials and resources to further assist City Staff in the operation and <br />maintenance of the flow control valves specific to the system. Upon request, the Contractor shall <br />provide training classes in the field and/or in a controlled class setting at certified Cla-Val facilities <br />following the manufacture's guidelines and operating techniques. <br />VI. VALUE ADDED RELATED SERVICES <br />The Contractor may propose additional related services that the City has not specifically <br />identified in this RFP to accomplish the stated goals of this RFP. Value added related <br />services will be considered by the City and may or may not be incorporated in the <br />agreement. All parts and materials must be supplied new and Cla-Val factory approved. <br />VII. SUBCONTRACTORS <br />The use of Subcontractors is allowed, but will require approval by City prior to start of any <br />assigned work. Upon commencement of work, the Contractor shall be responsible for services <br />provided by any subcontractor as if Contractor were providing the services with its own <br />organization. When a Subcontractor performs all or any part of the work, a markup shall be <br />applied to the Subcontractor's actual cost of such work. The Contractor may add a markup of 10 <br />percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 <br />percent on work added in excess of $5,000 of the subcontracted portion of the work may be <br />added by the Contractor. <br />VIII. PROJECT MANAGEMENT & COORDINATION <br />When a request for service is issued to the City, the Contractor shall issue an estimate to the <br />City's designated Project Manager. The Contractor shall not proceed with any work without the <br />approval of the City's designated project manager. <br />Contractors shall invoice the City on a monthly basis for all work performed during the period or <br />provide a one-time invoice at the completion of work issued. Each invoice shall be accompanied <br />by a summary of tasks performed, contract agreement number, results and progress on long- <br />term tasks if any. <br />IX. CODE COMPLIANCE <br />All materials and workmanship shall be in strict conformity with standards of the latest editions <br />including revisions of the following: <br />• American Society of Civil Engineers (ASCE) <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation Services <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.