My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:44:48 AM
Creation date
7/31/2024 12:21:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-050 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />APPENDIX <br />ATTACHMENT 2: FEE PROPOSAL <br />Certification - I certify that I have read, understand and agree to the terms and conditions of this <br />Request for Proposals. I have examined the Scope of Services (Appendix: Attachment 1) and am <br />familiar with the scope of work. I am familiar with all the existing conditions and limitations that may <br />impact work requests. I understand and agree that I am responsible for reporting any errors, omissions <br />or discrepancies to the City for clarification prior to the submission of my proposal. <br />Proposer shall submit hourly rates schedule, which shall include but not limited to, direct and <br />indirect costs for labor, for staff per job classification, material, equipment rates, overhead, <br />incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the <br />contractor only after discussed and authorized by the City projects manager or designee in <br />writing. <br />Prior to commencement of services, Contractor shall provide separate quotes, upon request by <br />the City, which shall be approved by the City's Public Works Agency. <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />1. Labor 1 Man Prevailing Wage <br />HR <br />200 <br />$ <br />$ <br />2. Labor 2 Men Prevailing Wage <br />HR <br />200 <br />$ <br />$ <br />3. Travel Per Day <br />EA <br />25 <br />$ <br />$ <br />Model 50-01 <br />4. Repair 4" Pressure Control Valve Rubber <br />EA <br />20 <br />$ <br />$ <br />Rebuilds for Main Valve and Pilot <br />5 Repair 6" Pressure Control Valve Rubber <br />EA <br />5 <br />$ <br />$ <br />Rebuilds for Main Valve and Pilot <br />6 Repair 8" Pressure Control Valve Rubber <br />EA <br />5 <br />$ <br />$ <br />Rebuilds for Main Valve and Pilot <br />7. Repair 10" Pressure Control Valve Rubber <br />EA <br />2 <br />$ <br />$ <br />Rebuilds for Main Valve and Pilot <br />8. Complete New 4" Model 50-01 1501b <br />Flanged/Epoxy Coated, Stainless Steel <br />Trim, Complete Stainless Steel Pilot <br />System, Opening & Closing Speed <br />EA <br />20 <br />$ <br />$ <br />Controls, Up Stream & Downstream <br />Pressure Gauges, X101 Valve Position <br />Indicator <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation <br />Services <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.