My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 18 - Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:43:09 AM
Creation date
7/31/2024 12:23:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Library Renovation Project <br />August 6, 2024 <br />Page 3 <br />Public Outreach and Contractor Participation <br />The City notified nine pre -qualified vendors via PlanetBids through RFQ #24-031A. <br />Furthermore, staff specifically reached out to those vendors to encourage their <br />participation in bids. A total of five bids were received. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on May 6, 2024 and May 13, 2024. The project was also advertised in <br />PlanetBids from May 1, 2024 through June 18, 2024. Bids were received electronically <br />via PlanetBids on June 18, 2024. No bid protest was submitted by any of the bidders <br />during the bid protest period. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid + <br />Alternates <br />1 <br />PCL Construction Services, Inc. <br />Irvine, CA <br />$19,353,442 <br />2 <br />S.J. Amoroso Construction Co., LLC <br />Costa Mesa, CA <br />$20,702,000 <br />3 <br />Pinner Construction Co., Inc. <br />Anaheim, CA <br />$22,388,000 <br />4 <br />ProWest PCM, Inc. <br />Wildomar, CA <br />$22,481,742 <br />5 <br />2H Construction <br />Signal Hill, CA <br />$22,708,700 <br />A total of five bids were received and all were deemed responsive. PCL Construction <br />Services, Inc. submitted the lowest responsive base bid and bid alternates in the <br />amount of $19,353,442 (Exhibit 2). As specified in the bid documents, the lowest bid <br />shall be determined on the basis of the Base Bid. Based on the bid analysis and a <br />contractor's reference check, staff recommends awarding the construction contract to <br />PCL Construction Services, Inc. (Exhibit 4). <br />PCL Construction Services, Inc. has not previously performed work as a prime <br />contractor in the City of Santa Ana within the last five years. A reference check was <br />made with staff and good reviews were received regarding the quality of work <br />performed by the contractor on previous projects. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration includes implementation of the labor <br />requirements; and oversight of the Library's construction management firm, Griffin <br />Structures, who will provide day-to-day construction management services, inspections, <br />and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized <br />
The URL can be used to link to this page
Your browser does not support the video tag.