Laserfiche WebLink
uses permitted in Section 1, above, or to any use permitted subject to a <br />conditional use permit: <br />a. Cafes and eating establishments limited to use by employees of the <br />uses specific in Section 1. <br />b. Administrative office use occupying up to thirty (30) percent of the gross <br />floor area. <br />c. Product sales or service uses occupying up to five (5) per cent of the <br />gross floor area. <br />d. Daycare centers occupying up to thirty (30) per cent of the gross floor <br />area; provided, however, that no combination of uses permitted by this <br />section shall exceed thirty (30) per cent of the gross floor area. <br />e. The outside storage of Class I and Class II liquids (as defined in the fire <br />code of the City of Santa Ana) in above -ground fixed storage tanks when <br />Properly screened pursuant to section 41-622 of the SAMC, as it may <br />be amended from time to time. As used herein, "tank" means a vessel <br />containing more than sixty (60) gallons. <br />f. Enclosed storage where the goods, materials or supplies stored are the <br />property of the owner or operator of the building or structure occupying <br />up to thirty (30) per cent. <br />g. Caretakers quarters consistent with the requirements in section 41-479 <br />of the SAMC. <br />Section 4 — Maximum Permitted Building Density/Intensity <br />The maximum authorized building densities/intensities for the Specific <br />Develoament Plan SD-58 Lake mentor are as follows: <br />1. 400,890 square feet <br />with the <br />existing and approved office and support commercial <br />uses ri �}tste-tsitMasc rcrPlan. <br />2. 569,230 square feet of additional floor area, including a maximum of <br />325,044 square feet of limited Light Industrial uses on the Light Industrial <br />Parcels. ParkiRg strUGtures and appurteRaRt uses are ROt O RGluded OR the <br />GaTGUIa+ion of floor arq�igur�illustrates u�tion�existin d <br />nrepecerd Master RaR e'^'f b iilydinnc <br />3. Parking structures and appurtenant uses are not included in the calculation <br />of floor area. <br />4. The precise timing of development, building sizes, and configuration are <br />predicated on market conditions at the time of construction and are subject <br />to change as market conditions change or as tenants become available. <br />Ordinance No. NS-XXXX <br />Page 8 of 22 <br />