My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024 Regular & Special HA
>
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 9:17:46 AM
Creation date
8/6/2024 8:50:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ta <br />www.FinanceDTA.com <br />SECTION III <br />RECURRING ANNUAL AND ONE- <br />TIME ECONOMIC IMPACTS <br />Figure 8: Project's One -Time Construction and Development Labor Income <br />ti $60 <br />c <br />0 <br />$50 <br />S9.8 j <br />$4.9 <br />$4.9 $2.5 <br />$40 <br />$30 <br />$38.0 <br />$20 <br />$10 <br />$0 <br />County City <br />Direct Indirect Induced <br />B.3 One -Time Total Economic Output <br />According to the IMPLAN Study Model, the development of the Project is also <br />projected to generate one-time increases of $105.82 million in Total Economic <br />Output from the construction and development of the site infrastructure <br />improvements and non-residential buildings within the County, with increases of <br />$84.66 million in Total Economic Output within the City. Table 11 and Figure 9 <br />below, as well as Appendix B, summarize the projected increases in total one-time <br />economic output generated from the construction and development of the Project <br />land uses. <br />Table 11: Project's One -Time Construction and Development Total Economic Output <br />.. <br />1 - <br />. <br />I. - . <br />County <br />$63,500,000 <br />$14,235,907 $28,083,641 <br />$105,819,548 <br />City8 <br />$63,500,000 <br />$7,117,954 $14,041,820 <br />$84,659,774 <br />Note: All numbers are subject to rounding. <br />8 Assumes 50% of the indirect/induced economic outputs generated in the County will be created within the <br />City. <br />South Coast Technology Center Project May 13 2024 <br />Economic Impact Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.